ML17219A512

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/87-06 & 50-389/87-06 on 870309- 13.No Violations or Deviations Noted
ML17219A512
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/08/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17219A513 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8704140307
Download: ML17219A512 (5)


See also: IR 05000335/1987006

Text

ACCESSION

NBR

F*C IL: 50-335

50-389

AUTH. NAME

RELLI > D. I'I

IP. NAME

DYI C. O.

REGULATORY INFORMATION DISTR IBUTION SYSTEI'I

(R IDS)

8704140307

DQC. DATh.: 87/04 /08

NOTARI Z ED:

NQ

St.

Lucie Planti Unit li Florida Pover

8c Light Co.

St.

Lucie Plant>

Unit 2i Florida Power

8r L>ght

Co.

AUTHOR AFFILIATION

Region

2i Office of Director

RECIPIENT AFFILIATION

Florida Power

h Light Co.

DOCKET

05000335

05000389

SUB JECT:

Forwards

Insp Repts .50-335/87-06

h

50-389/87-06

on

870309-13.

No violations noted.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED: LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAI'IE

PD2-2 LA

TOUR IGNYi E

INTERNAL: ACRS NYLIE

DEDRO

TE/DI/ORP9

NRR/ADT

NRR/DREP/EPB

NRR/DRIS DIR

QGC/HDS2

RES

SPEIS> T

E

AL:

LPDR

NSIC

COPIES

LTTR ENCL

1

0

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

PD2-2

PD

AEQD

El'

IEBERMAN

I!RR ROE'. L

I'!RR/DOEA D IR

I'!RR/DREP/RPB

NRR /PM*S/ ILRB

RGN2

FILE

01

NRC

PDR

COPIES

LTTR Er,'CL

1

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTlR

23

ENCL

22

P

,

APR 9 8 %87

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida

ower and Light Company

ATTN:

Mr'. C. 0.

Woody

Group Vice President

Nuclear

Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-335/87-06

AND 50-389/87-06

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

J. J.

Lenahan

on

March 9-13,

1987.

The

inspection

included

a

review of

activities authorized for your St.

Lucie facility.

At the conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope of the inspection,

no violations or deviations

were identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

OplGWAL Sio~--

"'AV}O

t<. ~E":--'p~l I 1

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

c w/encl:

K.

N. Harris, Vice President

St.

Lucie Nuclear Plant

. A. Sager,

Plant Manager

J.

B. Harper, Site gA Superintendent

bcc:

(See

page

2)

8704140307

870408

'DR

  • DOCK 05000335

9

PDR

-

<PR

P 8 1S

Florida Power

and Light Company

Qcc w/encl:

gNRC Resident

Inspector

Document Control

Desk

State of Flordia

RII pQ

JJLenahan:cc

g// /87

RII

FJa

+'~/87

Herdt

7. /87

RII

Wilson

9/7 /87

0