ML17219A483

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re 860702 Submittal on Transferring Spent Fuel.Response Requested within 30 Days of Ltr Receipt
ML17219A483
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/29/1987
From: Tourigny E
Office of Nuclear Reactor Regulation
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8704060120
Download: ML17219A483 (5)


Text

March 29, 1987 Docket Nos.

50-335 4

and 50-389 Mr. C. 0.

Woody Group Vice President Nuclear Energy Florida Power 8 Light Company P. 0.

Box 14000 Juno Beach, Florida 33408

Dear Mr. Woody:

DISTRIBUTION:

C. XRKTTIIE NRC 5 L PDR PBD¹8 Rdg FMiraglia EJordan BGrimes JPartlow OGC-Bethesda Gray File 3.7a NThompson ETourigny PKreutzer ACRS (10)

JRaval JMa DFieno In conducting our review of your July 2, 1986 submittal relating to transferring spent fuel at the St. Lucie Plant, Unit Nos. I and 2, we have determined that we will need the additional information identified in the enclosure to continue our review.

In order for us to maintain our review schedule, your response is requested within 30 days of receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than 10 respondents; therefore OMB clearance is not required under P.L.96-511.

Please contact me at (301) 492-8007 if you have any questions concerning this letter.

Sincerely,

Enclosure:

Request for Additional Information cc: w/enclosure See next page

/s/

E.

G. Tourigny, Project Manager PHR Project Directorate ¹8 Division of PWR Licensing-B PBD¹8'r

/~ /87 PBD¹ EGT nP:dj 3/4o/87 4<~

A D

utc field 3/A@87 ACT 3

adani

/87 PBD¹8

., 8704060120 870329 PDR ADOCK 05000335 P

PDR

) )l

<<))I 0

h II I

W I ~

V F

I'

)

V W

V W

W.

J

~

F

~

W tt r

Il

.l t.

V II

)

v l

r ~

W tl l

W r

I V

W

~

)

J II b

tr F

h W

W V

I It, JIIW vr

  • h t II f

t,

) '

f p IVI l I 1'

V /WI llIJ"b) 1 r

Mr. 'C.

0.

Woody Florida Power 8 Light Company St.

Lucie Plant CC:

Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector c/o U.S.

NRC 7585 S.

Hwy AlA Jensen Beach, Florida 33457 State Planning 8 Development Clearinghouse Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Harold F. Reis, Esq.

Newman 8 Holtzinger 1615 L Street, N.W.

Washington, DC 20036 Norman A. Coll, Esq.

McCarthy, Steel, Hector and Davis 14th Floor, First National Bank Building Miami, Florida 33131 Administrator Department of. Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone'oad Tallahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St.

Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington - Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue

Bethesda, Maryland 20814 Mr. Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Blvd.

Tal 1 ahassee, Florida 32301 Regional Administrator, Region II U. S ~ Nuclear Regulatory Commission Executive Director for Operations 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323

RE UEST FOR ADDITIONAL INFORMATION S. LCIEP NTSUNI S1 ND D CKET N S.

50-335 ND 50-389 SP N

'SF UN TS 1.

Provide a table showing the occupational doses to site and contractor support personnel resulting from ( 1) removing Unit No.

1 spent fuel from the Unit No.

1 spent fuel pool storage racks; (2) placing the spent fuel in a fuel shipping cask that meets the packaging and transportation requirements of 10 CFR 71; (3) removing the fuel shipping, cask from the Unit No.

1 fuel handling building; (4) moving the fuel shipping cask on a transporter vehicle from fuel handling building No.

1 to fuel handling building No.

2 (a distance of approximately 300 feet); (5) moving the fuel shipment cask into the Unit No.

2 fuel handling building; (6) removing the spent fuel from the fuel shipping cask; and (7) placing the spent fuel in the Unit No.

2 spent fuel pool storage racks.

The table should include a breakdown of each task by estimated dose rates, person-hours and person-rems.

2.

Confirm that FP8L will prepare and implement a plant-specific pro-cedure to be used for the transfer of Unit No.

1 spent fuel between the units.

1'