ML17219A388

From kanterella
Jump to navigation Jump to search
Informs That Operator Licensing Requalification Exam Originally Scheduled for 870803 Rescheduled for 870928 to Coincide W/Completion of Licensed Operator Requalification Training
ML17219A388
Person / Time
Site: Saint Lucie  
Issue date: 02/24/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-86-14, L-87-86, NUDOCS 8703030286
Download: ML17219A388 (4)


Text

pi ACCESSION NBR:

FAC IL:50-355 50-389 AUTH. NANE WOODY> C. O.

REC IP. NANE REQULATORY FORMATION DISTRIBUTION 'SY EN. (RIDS) 8703030286 DOC. DATE: 87/02/24 NOTARIZED:

NO DOCKET ¹ Hope Creek Nuclear Stationi Unit 2> Public Service El 05000355 St.

Lucie Pianti Unit 2I Florida Power 8c Light Co.

05000389 AUTHOR AFFILIATION Florida Power 8c Light Co.

RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs that operator licensing requalification exam originally scheduled for 870803 rescheduled for 870928 to coincide w/completion of licensed operator requalif ication tra1,n lng.

DIBTRIDOTION CODE:

I't003D COPIEB RECEIVED: LTR g ENCL O

SIZE:

TITLE: Operator Requalification Program NOTES:

RECIPIENT ID CODE/NANE BWR PD3 LA BWR PD3 PD WAQNER~ D INTERNAL AEOD/PTB NRR/DHFT/NTB RQNi COPIES LTTR ENCL RECIP IENT ID CODE/NAitE PWR-B PD8 LA PWR-B PD8 PD TOURIQNYi E 8

HFIB

)

Oi.

COP IES LTTR ENCL iif EXTERNAL: LPDR NSIC 03 05 NRC PDR 02.

TOTAL NUMBER OF COPIES REQUIRED'TTR ih ENCL

~I' I'

It 44

P. o. B 4000, JUNO BEACH, FL 33408.0420 FEBRUARY 84 1987 L-87-86 IO CFR 50 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re:

St. Lucie Units I and 2 Docket Nos. 50-335, 50-389 0 erator Licensin and Re uglification Schedule Generic Letter 86-l4 requested Licensees to provide their best estimate plans for operator licensing examinations during FY l987, FY l988, and FY l 989.

Florida Power 8 Light Company (FPL) provided its schedule by letter (L-86-388), dated September 28, I 986.

In that

letter, FPL scheduled an operator licensing requalification exam for August 3, l987.

This requalification exam has been rescheduled for September 28, l987.

The change was necessary to time the examination to coincide with the completion of Licensed Operator Requalification Training.

Very truly yours, C. O. Woo Group Vice resident Nuclear Energy COW/GRM/gp cc:

Dr. J. Nelson Grace, Regional Administrator, Region ll, USNRC USNRC Senior Resident Inspector, USNRC g6 87022+

05000365 pDR ADOGK pDR GR M5/022/ I an FPL Group company

~- ~

P H

II 0

iq,-s ~ i, grit~~<<,

gy g>>"-g,gag-r I

<4'il..+