Forwards Draft Safety Evaluation Re Station Blackout.Draft Highlights Several Issues Which Must Be Resolved Prior to Issuance of Final Safety Evaluation.Response Requested within 60 Days of Ltr Receipt
ML17219A360
Person / Time
Site: Saint Lucie 
Issue date: 02/13/1987
From: Tourigny E
Office of Nuclear Reactor Regulation
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17219A361 List:
References
REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR NUDOCS 8702250129
Download: ML17219A360 (7)


Text

FE~ ~3 1987 Docket No. 50-335 Nr.

C. 0.

Moody Group Vice President Nuclear Energy Florida Power 8 Light Company P.

0.

Box 14000 Juno Beach, Florida 33408

Dear Mr. Woody:

ist n

'cket RC/Local PDR PBD-8 Reading FMiraglia OGC-Bethesda JPartlow BGrimes EJordan Gray File 3.7a NThompson PKreutzer ETourigny DJaffe ACRS(10)

CThomas We are in the process of reviewing the subject of station blackout for St.

Lucie Unit 1.

The enclosed draft Safety Evaluation (SE) highlights several issues which must be resolved prior to NRC issuance of a final SE.

The key issue is the comparison of the St.

Lucie Units 1 and 2

DC power capabilities.

Me request that FP8L respond to the enclosed draft SE, especially with regard to the above detailed key issue, within 60 days following receipt of this letter.

Resolution of these issues would resolve the station blackout issue for St.

Lucie Unit 1 on an interim basis.

Final resolution of station black-out for St.

Lucie Unit 1 will be addressed as part of the NRC's rulemaking process.

This request for information affects fewer than 10 respondents; therefore OMB clearance is not required under P. L.96-511.

Sincerely,

@gglggt sighed Q

Enclosure:

As stated cc:

See next page E.

G.

Tour igny, Project Manager PMR Project Directorate ¹8 Division of PMR Licensing-B "See previous concurrence page.

~PBD"8:

"PBD-8:

P ~ter 0Jaf fe: jch g~ /g /86 JD/ZO/86

~PBD-8:

ETourigny ll fgz86

  • PBRS PBD-8 CThomas AThadani l I'7Ispp ~@86

>02250129 87O2~

QCK 05000335 PDR

T

~

/

K

Docket No. 50-335 Mr. C. 0.

Woody Group'ice President Nuclear Energy Florida Power 5 Lioht Company P. 0.

Box 14000 Juno Beach, Florida 33408

Dear Mr. Woody:

Distribution NRC/Local PDR PBD-8 Reading FMiraglia OGC-Bethesda JPartlow BGrimes EJordan Gray File 3.7a NThompson PKreutzer ETourigny DJaffe ACRS(10)

CThomas We are in the process of reviewing the subject of station blackout for St.

Lucie Unit 1.

The enclose draft Safety Evaluation (SE) highlights several issues which must be resolv d prior to NRC issuance of a final SE.

The key issue is the comparison of t e St. Lucie Units 1 and 2

DC power capabilities.

We request that FPIIL respond t the enclosed draft SE,. especially with regard to the above detailed key issue, within 60 days following receipt of this letter.

This request for information affects fewer than 10 respondents; therefore OMB clearance is not required under P.L.

6-511.

incerely, E.

G.

T urigny, Project Manager PWR Prog ct Directorate P8 Division f PWR Licensing-B

Enclosure:

As stated cc:

See next page

  • See previous concurrence page.
  • PBD-8:
  • PBD-8:

PKreutzer DJaffe:jch I4 W/86 rb /Ze'86

  • PBD-8:

ETourigny I/ /V/86 BRS PBD-8 gas AThadani Z /r/SP

/

/86

li

)

h tl lt I

b I,

I N

N l

Docket No. 50-335 Mr.

C. 0.

Woody Group Vice President Nuclear Energy Florida Power 8 Light Company P.

0.

Box 14000 Juno

Beach, Florida 33408 Distribution Docket File NRC/Local PDR PBD-8 Reading FMiraglia OGC-Bethesda JPartlow BGrimes EJordan Gray File 3.7a NThompson PKreutzer ETourigny DJaffe ACRS(10)

CThomas

Dear Mr..Woody:

We are in the process of reviewing the subject of station blackout for St.

Lucie Unit 1.

The enclosed draft Safety Evaluation (SE) highlights several issues which must be resolved prior to NRC issuance of a final SE.

The key issues are:

Comparison of the St.

Lucie Units 1 and 2

DC power capabilities Submittal and review of station blackout procedures and details of training Submittal of a re-evaluation of the event which provided reference data on peak pressure and fuel failure during the first few secon'ds of blackout.

i I

We request that FP8 L respond to the closed, draft SE, especially with regard to the above detailed key issues, with n 60 days following receipt of this letter.

This request for information affects fewer than 10 respondents; therefore OMB clearance is not required under P. L.96-511.

" Since ly,

Enclosure:

As stated E.

G. Touri py, Project Manager PWR Project Directorate 88 Division of PW Licensing-B cc:

See next page PB -8 PBD-8:

P er

'Jaffe:jch y/86

>p/gq /86 PBD-8'BRS PBD-8 ETour g y CThomas AThadani r/ /~/ /86

/

/86

/

/86

1

Mr.

C. 0.

Woody Florida Power 8 Light Company St.

Lucie Plant CC:

Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector c/o U.S.

NRC 7585 S.

Hwy AlA Jensen Beach, Florida 33457 State Planning 8 Development Clearinghouse Office of Planning 8 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Harold F. Reis, Esq.

Newman 8 Holtzinger 1615 L Street, N.W.

Washington, DC 20036 Norman A. Coll, Esq.

McCarthy, Steel, Hector and Davis 14th Floor, First National Bank Building Miami, Florida 33131 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St.

Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington '- Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue

Bethesda, Maryland 20814 Mr. Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Blvd.

Tallahassee, Florida 32301 Regional Administrator, Region II U.S.

Nuclear Regulatory Commission Executive Director for Operations 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323