Advises That Util & C-E Owners Group Will Submit All Info Required by Generic Ltr 86-06 by 870630
ML17219A358
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/12/1987
From: Woody C
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-86-06, GL-86-6, L-87-52, NUDOCS 8702240311
Download: ML17219A358 (4)


Text

REGULATORY ~FORNATION DISTRIBUTION SYB 6N (RIDS)

ACf-'ESSION NBR: 8702240311 DOC. DATE: 87/02/12 NOTARIZED:

NO FACIL:50-335 St.

Lucie Plant>

Unit iI Florida Power Lcc Light Co.

50-389 St.

Lucie Plant.

Unit 2I Florida Power 8c Light Co.

AUTH. NAl')E AUTHOR AFFILIATION WOODY> C. O.

Florida Power Zc Light Co.

REC IP. NAI'tE RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT;.

Advises that util 5 C-E Owners Group will submit all inl-o required bg Generic Ltr Sb-Ob bg 870b30.

DIBTRIBUTION CODE:

A04BD COP IEB RECEIVED: LTR g ENCL Q.

SIZE:

TITLE:

OR Submittal:

TNI Action Plan Rgmt NUREG-0737 Lc NUREG-ObbO NOTES:

DOCKET 05000335 05000389'ECIPIENT ID CODE/NAI'fE PWR-B ADTS PWR-B PEICSB PWR-B PD8 LA TOUR IGNYiE PWR-B RSB COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-B EB PWR-B FOB PWR-B PD8 PD 04 PWR-B PEICSB COPIES LTTR ENCL INTERNAL ADN/LFNB ELD/HDS2 IE/DEPER/EPB NRR PAULSON, W.

NRR PWR-B ADTS 01 EXTERNAL: LPDR 03 NSIC 05 1

1 3

1 1

NRC PDR 02 AEOD/PTB 1

IE/DEPER DIR 33 1

NRR BWR ADTS NRR PWR-A ADTS 1

NRR/DSRO EMRIT TOTAL NUNBER OF COPIES REQUIRED:

LTTR 30 ENCL

~ J JIJII l I

yv v

~ QI I~ v I

~ 1 P

I 1I I

v

P. O. Bo 000, JUNO BEACH, FL 33408.0420

>ygilllyz

~/i't>)0+

FEBRUARY 12 198 L-87-52 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gent lemen:

Re:

St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Generic Letter 86-06 By letter L-86-325, dated August 6, l986, Florida Power & Light Company (FPL) endorsed the Combustion Engineering Owners Group (CEOG) reactor coolant pump trip criterion methodology (i.e., trip-two/leave-two staggered reactor coolant pump trip).

ln that same letter, FPL informed the NRC of the date by which the plant-specific information in response to Generic Letter 86-06 (GL 86-06), items I, 3 and 4 would be submitted to the staff.

FPL also committed to provide a schedule for the submittal of information concerning instrumentation uncertainties (i.e. GL 86-06, item 2).

CEOG has developed a schedule for submitting the instrumentation uncertainties information, and FPL has improved on the earlier schedule submitted to the staff for providing the GL 86-06 plant-specific information.

As a result, FPL and the CEOG plan to submit to the staff all information required by GL 86-06 by June 30, l 987. This schedule has been found acceptable by the NRC Project Manager.

lfyou have any questions about this information, please contact us.

Very truly yours, C.O. W Group President Nucl Energy COW/EJW/gp cc:

Dr. J. Nelson Grace, Region II, USNRC USNRC Resident inspector, St. Lucie Plant

( 8702240311 870212 PDR ADOCK 05000335 p