ML17219A331
| ML17219A331 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 01/30/1987 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-87-41, NUDOCS 8702050272 | |
| Download: ML17219A331 (6) | |
Text
ACCESSION NBR FAC IL: 50-335 AUTH. NANE NOGDYi C. O.
RECIP. NANE REQULATORY FORNATION DISTRIBUTION SY'N.'R IDS>
8702050272 DOC. DATE: B7/Oi/30 NOTARIZED:
NO St.
Lucie Planti Unit ii Florida Pomer 8c Light Co.
AUTHOR AFFILIATION Florida Potoer 5 Light Co.
RECIPIENT AFFILIATION Document Contv ol Branch (Document Control Desk)
DOCKET 0 05000335
SUBJECT:
Responds to 861201 request for addi info to addvessing special civ cumstance v'equirements of 10CFR50. 12 in support of 1 equests for exemptions. Engineering 5 installation of listed items mould v esult in expendituv e of v esouv ces.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR /
ENCL ~
SIZE:
TITLE:
OR Submittal:
General Distv ibution NOTES:
RECIPIENT ID CODE/NAI'IE PNR-8 EB PNR-8 FOB PNR-8 PDB PD 01 PNR-8 PEICSB COP IES LTTR ENCL RECIPIENT ID CODE/NANE PWR-8 PEICSB PMR-8 PD8 LA TOURIQNYz E PWR-8 RSB COP IES LTTR ENCL 2
1 1
INTERNAL: ADN/LFNB SCB 04 ELD/HDS2 NRR/GRAS EXTERNAL:
EQ8(Q BRUSQUE> S NRC PDR 02 LPDR NSIC 03 05.
TOTAL NUNBER OF COPIES REQUIRED:
LTTR 22 ENCL
0
'l "W
I N
P. O. B 000, JUNO BEACH, FL 33408 0420 IANUAPy ~0 f98 L-87-4 I U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gent lemen:
Re:
St. Lucie Unit I
Docket No. 50-335 Fire Protection Additional Information on Technical Exem tions In response to your request dated December I, l986, and consistent with the schedule provided by Florida Power Bc Light Company (FPL) letter (L-86-5I8) dated December 22, l986, FPL is providing the following information to address the "special circumstances" requirements of IO CFR 50.I2.
This additional information is intended to supplement our exemption requests dated December l4, l983, November 28 and December 3I, 1984, and February 2I, I 985.
The fire protection features at St. Lucie Unit I accomplish the underlying purpose of the rule.
To require installation of additional suppression
- systems, detection
- systems, and fire barriers would result in the expenditure of engineering and construction resources as well as the associated capital costs.
The costs to be incurred are those costs associated with:
Engineering and installation of additional piping, sprinkler
- heads, and supporting structures and associated surveillances.
Engineering and installation of fire barriers, supports, support protection, and ongoing maintenance.
Engineering and installation of replacements for existing mechanical and electrical containment penetrations.
Engineering and installation of additional fire detection systems and the associated surveillance.
Increased congestion in a number of plant locations complicating future plant modifications/operations.
8702050272 870130 PDR ADOCK 05000335 I
F PDR
)go
( t)
GRM5/004/ I an FPL Group company
I
'C 4>>
4 NNNI Nv..rJ'r 4
~
~
4 4
NNI J
~ '
s
~
~
~
I( IJ1 I ~
Kl I',1 INAII v
I i
~
I JC I
r r IL 4 ~. r 4 I K>>
r
~
rv1 IS+AN A'
I 4 'v 14 4
4 A
N.NN vr( =. ~
I 4
Nr r
r
~
s
~..
1' I I 1rI 4 C
rv v
4
hv v
I I
~.
~ ~
v NN A)Ni Kd 4
~
4
'I I,I I
r
<< I
~
I I II 'Kr
'I I
- Nr (r 4
~ ~
A I
r I
I I
~
r 1
s I
I N,l,
=
ri,
~ IK. ',r ~
NVlrr Kwr( ~ INN llr,>>'ss, Ir r C(JI I 1
Ill 4's, 1
I' 4 vr
( i
. llvr)r" I
~
~II ~
I I vi.4 4
6 I
1 I
1 4 sv
~ rsi'1 I
4 fv r
Kv I
m I
4 J
~ I N
rii AI 4
4 4
I ~
CII11v I
11 4 (r I
Il ll I
~
NN II 4
4 I
I' A
44
=4
~
v 1
4 r I I
N~.r vvN JINN v (EK 4
Ilv I
I
- 1. ~ I vr
~
4 NN( N>rvl CI I i ANI"
,.NNK I
I s'-
4 1M 'i I
"id 4
(>>4 lr, v
I
'I 4 4, r(4()C
~ I v
(CKNC IN'.KN v
NIC'r
- Nvr, 4
~ I' I
4 - ~
'rv
~ I I.
~.>. I vvI~
r(NS
~
4 rirr 1 ~
4 I r*
4 I
I
'1 ONV Ngrrr 4 I Srrrr 'If A
I 4
r ),
sNKNr
U. S. Nuclear Regulatory Commission L-87-4I Page two FPL believes that appliciation of the regulation in these particular circumstances is not necessary to achieve the underlying purpose of Appendix R to 10 CFR 50.
See 10 CFR 50.I2(a)(2)(ii).
Furthermore, the costs to accomplish the above is significantly in excess of those required to meet the underlying purpose of the rule.
See 10 CFR 50. l2(a)(2)(iii).
Should you have any further questions regarding this matter, please contact us.
Very truly yours, C. O. Wood Group Vi resident Nuclear Energy COW/GRM/gp cc:
Dr. J. Nelson Grace, Region ll, USNRC Senior Resident inspector, USNRC, St. Lucie Plant GR M5/004/2
r~
v+
(
4 4
4 4
4 4
II
~
4 0
I(
4