Text
REGULATORY ORMATION DISTRIBUTION SY M (R IDS)
ACCESSION NBR: 8701290016 DOC. DATE: 87/01/21 NOTARIZED:
NO FACIL'q50-335 St.
Lucie Planti Unit ii Florida Power 8r Li,ght Co.
AUTH. NAME AUTHOR AFFILIATION WOODY> C. O.
Florida Power 5 Light Co.
RECIP. NAME RECIPIENT AFFILIATION Document Contro I Branch (Document 'Control Desk )
DOCKET 05000335
SUBJECT:
Provides commitment that radiograhic exam of pump thrill be performed when pump disassembled for maint. per 870108 telcon re util 861029 Inservice Insp Relief Request 8.
DISTRIBUTION CODE:
- 047D COPIES RECEIVED: LTR
(
ENCL 0 SIZE:
TITLE:
OR, Submittal:
Inservice Inspection/Testing NOTES RECIPIENT ID CODE/NAME PWR-B ADTS PWR-B PD8 LA TOURIGNY~ E INTERNAL: ADM/LFMB ELD/HDS2 NRR/TAMB COPIES LTTR ENCL RECIPIENT ID CODE/NAME PWR-B EB PWR-B PD8 PD 01 AEOD/PTB O/EIB REQ IL 04 COPIES LTTR ENCL i EXTERNAL: LPDR NSIC 03 05 NRC PDR 02.,
TOTAL NUMBER OF COPIES REQUIRED'TTR 18 ENCL
"P*
'l.vl>>l,
)
ti vi Iv" 0'>>
P 4'..I(.
C fCII" I,'v V
) l,lg>>
g V~7
)III
'I VQ ~ Q V)lf 'I
)
vI VII'vII
'I,l l( l lI) ~,H i,
i.iyg
)P,,
V V
i I'~V iV Ii II vii Ii vV V IV It 5
4 ~
FLORIDA POWER & LIGHTCOMPANY U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 JANUARY 21 i987 L-87-24 Gent lemen:
Re:
St. Lucie Unit I
Docket No. 50-335 ISI Relief Re uest No. 8 By letter L-86-4I I, dated October 29, l986, Florida Power 5 Light Company (FPL) submitted Relief Request II8, along with other inservice inspection relief
- requests, for St. Lucie Unit I.
Relief Request j18 requested relief from the volumetric examination requirement of ASME Boiler and Pressure Vessel Code Section XI.
FPL discussed Relief Request II8 with the NRC Staff on January 8, l987.
As a result of this conversation, in addition to the alternative examination proposed in our October 29, l986 letter, FPL commits to the following:
I.
If a pump is disassembled for maintenance, a radiographic examination of that pump will be performed.
The extent of,the examination will depend upon access and geometry limitations.
2.
Part of one weld on one pump at St. Lucie Unit II2 will be ultrasonically examined during the refueling outage scheduled for Fall I 987.
This examination wilI be per formed using the best current technique as determined by FPL to determine the feasibility of performing future examinations.
If there are any questions on the above additional commitments, please contact use Very truly yours, C.O.Wo d Group Vi President Nuclear Energy COW/EJW/gp
. (
cc:
Dr. J. Nelson Grace, Region II, USNRC USNRC Resident Inspector, St. Lucie Plant EJW3/OI 9/ I 8701290016.870121 PDR ADOCK 05000335 8