ML17219A312
| ML17219A312 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 01/12/1987 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| NUDOCS 8701200396 | |
| Download: ML17219A312 (4) | |
Text
ACCESSION NBR:
FAC IL:50-389 AUTH. NAI1E MOODY> C. O.
RECIP. NAME 1
REQ TO INFORMATION DISTR IBU N
TEl'1 (R IDS) 8701200396 DOC. DATE: 87/01/12 NOTARIZED:
NO St.
Lucie Plant.
Unit 2. Florida Power 8c Light Co.
AUTHOR AFFILIATION Florida Power 5 Light Co.
RECIPIENT AFFILIATION Record Services Branch (Document Control Desk)
DOCKET N 0500038'Ii
SUBJECT:
Provides schedule For completion oF engineering necessary For modiFications to structural steel supports in Fire Areas A> C> H Zc 0> per NRC 861205 request. Engineering will be completed bg November 19'87.
DISTRIBUTION CDDE:
ADDED CDPIES RECEIVED: LTR i ENCL 0 SIZE:
TITLE: QR/Licensing Submittal: Fire Protection NOTES:
RECIPIENT ID CODE/MANE PNR-B PDS LA TOUR IGNY> E INTERNAL: -ADl't/LFNB IE WHITNEY>L NRR MERNEIL>J06 CO< IES LTTR ENCL RECIPIENT ID CODE/MANE PWR-B PDS PD 01 P41R-B PEICSB ELD/HDS2 NRR STANQ> J 07 04 COP IES LTTR E4CL 1
2 1
EXTERNAL: LPDR NSIC 03 05 NRC PDR 02 TOTAL NUBBER OF COPIES REQUIRED LTTR 18 ENCL
'8 l
y, Fg, g
P'I II
~
4 t
v K
I E
~+
0
'. O.
14000, JUNO BEACH, FL 33408-0420
~~sW/~
JANUARY 1 3 1987 L-87-20 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gent lemen:
Re:
St. Lucie Unit 2 Docket No. 50-389 Fire Protecton Technical Deviation Safet Evaluation C
ln response to your request dated December 5,
l986, Florida Power & Light Company (FPL) is providing the schedule to complete the engineering necessary for the modifications to structural steel supports in fire area M and in rooms that do not have sprinkler protection in fire areas A, C, H, and O.
The engineering is scheduled to be completed by November I 987.
Upon completion of the detailed engineering design for the modifications, FPL will be able to provide a construction schedule for implementing the modification.
FPL will inform the Project Manager of any changes in the schedule.
The above fire areas are patrolled by a roving fire watch.
This is considered adequate compensatory measures until the modifications have been completed.
Should there be any further questions regarding this matter, please contact us.
Very truly yours, C.O. W Group Vice President Nuclear Energy COW/GRM/gp cc:
Dr. J. Nelson Grace, Region Il, USNRC R. V. Crlenjak, USNRC SRI, St. Lucie Plant E. G. Tourigny, PBD8, NRR, USNRC Harold F. Reis, Esquire 8701200396 870li2 PDR" ADOCK 05000389 F
",PDR GRM5/P06/l PEOPLE... SE VING PEOPLE