ML17215A845

From kanterella
Jump to navigation Jump to search
Forwards Revised Procedures Generation Package & Listing of All Locations of Items Identified in Draft Ser,Per NRC 841218 Ltr
ML17215A845
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/12/1985
From: Williams J
FLORIDA POWER & LIGHT CO.
To: John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML17215A846 List:
References
L-85-153, TAC-44337, TAC-55343, NUDOCS 8504190308
Download: ML17215A845 (4)


Text

. 'v REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8504190306 . OC DATE: 65/Og/'12 NOTARI,~: NO DOCKET FACIL:50"335't. Lucie Plant~ Unit

~'50-369't, Lucie Plant< Unit

~

li Flor ida Power 5 Light Co.

Florida Power Light Co.

05000335 05000369 2~ 8 AUTH, NAME AUTHOR AFFI'LIATION WILLIAMS' ~ W~ Florida Power L Light Co ~

RECIP ~ NAME RECIPIENT AFFILIATION MILLER/J ~ R ~ Operating Reactors Branch 3

SUBJECT:

Forwards revised "Procedures Generation Package" 8 listing of all locations~of items identified in draft SERiper NRC 801?18 l tr ~

s=a ~~~, a~~c~yy P~

DISTRIBUTION CODE: AO01D TITLE: OR Submittal: General COPIES RECEIVED:LTR Distribution J ENCL SIZE:~ .g +'

f 05000335 NOTES'L:02/01/76 05000389 OL:04/06/83 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR ORB3 BC 01 7 7 NRR ORB3 BC'1 7 7, INTERNAL: ACRS 09 6 6 ADM/LFMB 1 0 ELD/HDS2 1 0, NRR/DE/MTEB 1 1 NRR/DL DIR 1 1 NRR/DL/ORAB 1 0 NRR/DL/TSRG 1 1 N SI/METB 1 NRR/DS I/RAB 1 1 REG OQ 1 1 RGN2 1 1 EXTERNAL: EGLG BRUSKE,S 1 1 LPDR 03 NRC PDR 0?. 1 1 NSIC 05 TOTAL NUMBER OF COPIES REQUIRED: LTTR 34 ENCL 31

. 0

~ r

FLORIDA POWER & LIGHT COMPANY April 12, 1985 L-85-153 Office of Nuclear Reactor Regulation Attention: Mr. 3ames R. Miller, Chief Operating Reactors Branch II3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Miller:

Re: St. Lucie Units No. 1 R 2 Docket Nos. 50-335, 50-389 Procedures Generation Package (NRC TAC Nos. 00337 and 55303 An NRC letter of December 18, 1980, identified several items in the procedure generation program for St. Lucie Units 1 and 2 that require revision before the Procedures Generation Package is acceptable. Attached is the revised Procedures Generation Package. Also attached is a listing of each of the items identified in the Draft Safet'y Evaluation Report, and the location in the Procedures Generation Package where each item is addressed.

Very truly yours,

~~W. Willi s, 3r.

Group Vice resident Nuclear Energy 3 W W/33 M/js Attachment cc: Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-150 p 850yfe0308 850+01~>> >

PDR POOCH 0500 F

PEOPLE... SERVING PEOPLE

l