ML17215A786
| ML17215A786 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/05/1985 |
| From: | John Miller Office of Nuclear Reactor Regulation |
| To: | Williams J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17215A787 | List: |
| References | |
| NUDOCS 8503200501 | |
| Download: ML17215A786 (2) | |
Text
March 5, 1985 Docket No. 50-389 Mr. J.
W. Williams, Jr.
Vice President Nuclear Energy Department Florida Power 5 Light Company P. 0.
Box 14000 Juno Beach, Florida 33408
Dear Mr. Williams:
SUBJECT:
AXIAL GROWTH OF FUEL RODS DISTRIBUTION:
RCETFltE NRC PDR L PDR ORB¹3:Rdg HThompson OELD EJordan BGrimes JPartlow DESells PMKreutzer ACRS +10 Gray File The staff has completed its review of your November 8, 1984 report dealing with axial growth of fuel rods for St. Lucie Plant, Unit No. 2.
The staff has concluded that you have demonstrated in your report that adequate shoulder gap clearance is'aintained for unmodified fuel assemblies through the second cycle.
However, you should measure shoulder gaps on selective fuel assemblies during the second refueling outage in order to confirm the model described in the report and to confirm that adequate shoulder gap remains for operation after cycle 2.
A copy of our safety evaluation is enclosed.
Sincerely,
Enclosure:
Safety Evaluation cc w/enclosure See next page OrlgnaI signed by:
James R. Miller, Chief Operating Reactors Branch ¹3 Division of Licensing
- DL ORB¹3:DL Pgrebtzer DESej.ls:dd
/fan /85 P/+/85 8503200501 850305 PDR ADOCK 05000389 P
PDR 0 B¹3:DL JRMi31er i+185
<<1
~
H g 'I
~
I