ML17215A765

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Re Use of Exxon Nuclear Creep Collapse Methodology on C-E Fuel.Use of Methodology Acceptable.License Condition 2.C.(4) Should Be Deleted
ML17215A765
Person / Time
Site: Saint Lucie 
Issue date: 02/19/1985
From: John Miller
Office of Nuclear Reactor Regulation
To: Williams J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17215A766 List:
References
NUDOCS 8503050557
Download: ML17215A765 (4)


Text

DISTRIBUTION:

NRC PDR F88 g 8 t~@

Local PDR ORB¹3 Rdg DEisenhut OELD EJordan JPartlow PMcKee DSells PMKreutzer ACRS +10 Docket No. 50-335 Mr. J.

W. Williams, Jr.

Vice President Nuclear Energy Department Florida Power 8 Light Company P. 0.

Box 14000 Juno Beach, Florida 33408

Dear Mr. Williams:

SUBJECT:

EXXON NUCLEAR CREEP COLLAPSE METHODOLOGY - ST.

LUCIE PLANT UNIT NO.

1 In your submittals of September 17, 1984 and February 4, 1985 you supplied additional information regarding the use of Exxon Nuclear creep collapse methodology on Combustion Engineering fuel.

A copy of our safety evaluation is enclosed.

Sincerely, The staff has completed its review of =your submittals and has determined that the use of the Exxon methodology on CE fuel is acceptable.

Based on this, the current license condition 2.C.(4) has been satisfied and no longer applies.

You should initiate action to have license condition 2.C.(4) deleted at your earliest convenience.

Enlosure:

Safety Evaluation cc w/enclosure See next page Orlglnal signed by:

James R. Miller, Chief Operating Reactors Br anch ¹3 Divis ion of Licens ing 3:DL ORB¹3:DL PKreutzer 2/

/85 ESells:dd 2/ff/85 BSO30S0557 85O2>9 PDR ADOCK 05000335 P

PDR taboo~

JRMill 2//0/85

l I K I

~

~

, ~

Docket No. 50-335 Mr. J.

W. Williams, Jr.

Vice President Nuclear Energy Department Florida Power 8 Light Company P. 0.

Box 14000 Juno Beach, Florida 33408 DISTRIBUTION:

oc et 1

e NRC PDR Local PDR ORBk'3 Rdg DEisenhut OELD EJordan JPartlow PMcKee DSells PMKreutzer ACRS +10

Dear Mr. Williams:

SUBJECT'XXON NUCLEAR CREEP COLLAPSE METHODOLOGY ST.

LUCIE PLANT UNIT NO.

2 In your submittals of September 17, 1984 and February 4, 1985 you supplied additional information regarding the use of Exxon Nuclear creep collapse methodology on Combustion Engineering fuel.

The staff has completed its review of your submittals and has determined that the use of the Exxon methodology on CE fuel is acceptable.

Based on this, the current license condition 2.C.(4) has been satisfied and no longer applies.

You should initiate action to have license condition 2.C.(4) deleted at your earliest convenience.

A copy of our safety evaluation is enclosed.

Sincerely, Enlosure:

Safety Evaluation cc w/enclosure See next page James R. Miller, Chief Operating Reactors Branch P3 Division of Licensing ORBP:DL er 2

/85 ORB83:DL DESells:dd 2/

/85 ORB83:DL JRMiller 2/

/85

'I I4 nr