ML17215A632

From kanterella
Jump to navigation Jump to search
Forwards Fuel Rod Axial Growth Evaluation, Per License Condition 2.C.5.Results of Shoulder Gap Insp & Evaluation Assure Shoulder Gap Clearance Adequate for All Future Cycles
ML17215A632
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/08/1984
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17215A633 List:
References
L-84-314, NUDOCS 8411120363
Download: ML17215A632 (3)


Text

$

>~

REGULATO INFORNATION DISTRIBUTION STEN (RIDS)

ACCESSION NBR 8411120363 DOC. DATE: 84/11/08 NQTARIZED: NQ DOCKET ¹ FAC IL'0-389 St. Lucie Planti Unit 2i Florida Power 5 Light Co. 05000389

  • UTH. NANE AUTHOR AFFILIATION MILLIANSiJ. W Florida Power 5 Light Co.

RECIP. NANE RECIPIENT AFFILIATION EISENHUTe D. G Division of Licensing

SUBJECT:

Forwards "Fuel Rod Axial Growth Evaluationi" per License Condition a. c. s. Results of shoulder gap insp h evaluation assure shoulder gap clearance adequate for all future cycles.

DISTRIBUTION CODE: A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES: 05000389 OL: 04/06/83 RECIPIENT COPIES RECIPIENT COPIES ID CODE/MANE LTTR ENCL ID CODE/NANE LTTR ENCL NRR QRB3 BG 01 7 7 INTERNAL'CRS 09 6 ADN/LFNB 1 0 ELD/HDS2 1 0 NRR/DE/NTEB 1 1 NRR/DL DIR 1 NRR/DL/ORAB 0 NRR/DS I /METH 1 NRR/DS I /R*B 1 1 04 RGN2 1 1 EXTERNAL: LPDR 03 1 1 NRC PDR NSIC 05 1 1 NTIS 1 1 TOTAL NUNBER OF COPIES REQUIRED: LTTR 26 ENCL 23

k N

" ',.',' I';,,",,",3 N i

N W.),v,f )g Pl N s

VNN

'.NI I

)

',ll' Vk

. BOX 14000, JUNO BEACH, F I 33408

~/9 ll/

+III>%1%+

FLORIDA POWER 8 LIGHT COMPANY November 8, 1984 L-84-3I4 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Eisenhut:

Re: St. Lucie Unit No. 2 Docket No. 50-389 Axial Growth - License Condition 2.C.5 ln accordance with License Condition 2.C.5 ~ ~ attached is the St LucIe nI t N o. 2 Ga E valuation Report. The results of the shoulder gap inspection and ou er Gap Shoulder t h e evaluation assure that the shoulder gap clearance is adequate for all future cyc es.

Very truly yours,

~

J. W.~ Williams, J .~

Vice President Nuclear Energy JWW/R JS/cab Attachment 84ii08

,841.1.120363 05000389 P," ',

"DR '.'

'.PDR.ADOCK PEOPLE... SERVING PEOPLE