L-84-314, Forwards Fuel Rod Axial Growth Evaluation, Per License Condition 2.C.5.Results of Shoulder Gap Insp & Evaluation Assure Shoulder Gap Clearance Adequate for All Future Cycles

From kanterella
(Redirected from ML17215A632)
Jump to navigation Jump to search
Forwards Fuel Rod Axial Growth Evaluation, Per License Condition 2.C.5.Results of Shoulder Gap Insp & Evaluation Assure Shoulder Gap Clearance Adequate for All Future Cycles
ML17215A632
Person / Time
Site: Saint Lucie 
Issue date: 11/08/1984
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17215A633 List:
References
L-84-314, NUDOCS 8411120363
Download: ML17215A632 (3)


Text

$

> ~

ACCESSION NBR FACIL'0-389

  • UTH. NANE MILLIANSiJ.

W RECIP. NANE EISENHUTe D. G REGULATO INFORNATION DISTRIBUTION STEN (RIDS) 8411120363 DOC. DATE: 84/11/08 NQTARIZED:

NQ St.

Lucie Planti Unit 2i Florida Power 5 Light Co.

AUTHOR AFFILIATION Florida Power 5 Light Co.

RECIPIENT AFFILIATION Division of Licensing DOCKET ¹ 05000389

SUBJECT:

Forwards "Fuel Rod Axial Growth Evaluationi" per License Condition

a. c. s. Results of shoulder gap insp h evaluation assure shoulder gap clearance adequate for all future cycles.

DISTRIBUTION CODE:

A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE:

OR Submittal:

General Distribution NOTES:

OL: 04/06/83 05000389 RECIPIENT ID CODE/MANE NRR QRB3 BG 01 INTERNAL'CRS 09 ELD/HDS2 NRR/DL DIR NRR/DS I/METH 04 COPIES LTTR ENCL 7

7 6

1 0

1 1

RECIPIENT ID CODE/NANE ADN/LFNB NRR/DE/NTEB NRR/DL/ORAB NRR/DS I/R*B RGN2 COPIES LTTR ENCL 1

0 1

1 0

1 1

1 1

EXTERNAL:

LPDR NSIC 03 05 1

1 1

1 NRC PDR NTIS 1

1 TOTAL NUNBER OF COPIES REQUIRED:

LTTR 26 ENCL 23

k N

" ',.',' I';,,",,",3 i

N W.),v,f )g VNN s

Pl N

N

'.NI I ) ',ll' Vk

. BOX 14000, JUNO BEACH, F I 33408

~/9 ll/

+III>%1%+

FLORIDA POWER 8 LIGHTCOMPANY November 8, 1984 L-84-3I4 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Eisenhut:

Re:

St. Lucie Unit No. 2 Docket No. 50-389 Axial Growth - License Condition 2.C.5 Shoulder Ga E

ln accordance with License Condition 2.C.5 attached is the St L t N 2

~

~

ucIe nI o.

h ou er Gap valuation Report.

The results of the shoulder gap inspection and t e evaluation assure that the shoulder gap clearance is adequate for all future cyc es.

Very truly yours, J. W. Williams, J.

~

~

~

Vice President Nuclear Energy JWW/RJS/cab Attachment

,841.1.120363 84ii08

'.PDR.ADOCK 05000389 P,"

', "DR '.'

PEOPLE... SERVING PEOPLE