L-84-314, Forwards Fuel Rod Axial Growth Evaluation, Per License Condition 2.C.5.Results of Shoulder Gap Insp & Evaluation Assure Shoulder Gap Clearance Adequate for All Future Cycles

From kanterella
(Redirected from L-84-314)
Jump to navigation Jump to search
Forwards Fuel Rod Axial Growth Evaluation, Per License Condition 2.C.5.Results of Shoulder Gap Insp & Evaluation Assure Shoulder Gap Clearance Adequate for All Future Cycles
ML17215A632
Person / Time
Site: Saint Lucie 
Issue date: 11/08/1984
From: Williams J
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17215A633 List:
References
L-84-314, NUDOCS 8411120363
Download: ML17215A632 (3)


Text

$

> ~

ACCESSION NBR FACIL'0-389

  • UTH. NANE MILLIANSiJ.

W RECIP. NANE EISENHUTe D. G REGULATO INFORNATION DISTRIBUTION STEN (RIDS) 8411120363 DOC. DATE: 84/11/08 NQTARIZED:

NQ St.

Lucie Planti Unit 2i Florida Power 5 Light Co.

AUTHOR AFFILIATION Florida Power 5 Light Co.

RECIPIENT AFFILIATION Division of Licensing DOCKET ¹ 05000389

SUBJECT:

Forwards "Fuel Rod Axial Growth Evaluationi" per License Condition

a. c. s. Results of shoulder gap insp h evaluation assure shoulder gap clearance adequate for all future cycles.

DISTRIBUTION CODE:

A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE:

OR Submittal:

General Distribution NOTES:

OL: 04/06/83 05000389 RECIPIENT ID CODE/MANE NRR QRB3 BG 01 INTERNAL'CRS 09 ELD/HDS2 NRR/DL DIR NRR/DS I/METH 04 COPIES LTTR ENCL 7

7 6

1 0

1 1

RECIPIENT ID CODE/NANE ADN/LFNB NRR/DE/NTEB NRR/DL/ORAB NRR/DS I/R*B RGN2 COPIES LTTR ENCL 1

0 1

1 0

1 1

1 1

EXTERNAL:

LPDR NSIC 03 05 1

1 1

1 NRC PDR NTIS 1

1 TOTAL NUNBER OF COPIES REQUIRED:

LTTR 26 ENCL 23

k N

" ',.',' I';,,",,",3 i

N W.),v,f )g VNN s

Pl N

N

'.NI I ) ',ll' Vk

. BOX 14000, JUNO BEACH, F I 33408

~/9 ll/

+III>%1%+

FLORIDA POWER 8 LIGHTCOMPANY November 8, 1984 L-84-3I4 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Eisenhut:

Re:

St. Lucie Unit No. 2 Docket No. 50-389 Axial Growth - License Condition 2.C.5 Shoulder Ga E

ln accordance with License Condition 2.C.5 attached is the St L t N 2

~

~

ucIe nI o.

h ou er Gap valuation Report.

The results of the shoulder gap inspection and t e evaluation assure that the shoulder gap clearance is adequate for all future cyc es.

Very truly yours, J. W. Williams, J.

~

~

~

Vice President Nuclear Energy JWW/RJS/cab Attachment

,841.1.120363 84ii08

'.PDR.ADOCK 05000389 P,"

', "DR '.'

PEOPLE... SERVING PEOPLE