L-84-314, Forwards Fuel Rod Axial Growth Evaluation, Per License Condition 2.C.5.Results of Shoulder Gap Insp & Evaluation Assure Shoulder Gap Clearance Adequate for All Future Cycles
| ML17215A632 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/08/1984 |
| From: | Williams J FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17215A633 | List: |
| References | |
| L-84-314, NUDOCS 8411120363 | |
| Download: ML17215A632 (3) | |
Text
$
> ~
ACCESSION NBR FACIL'0-389
- UTH. NANE MILLIANSiJ.
W RECIP. NANE EISENHUTe D. G REGULATO INFORNATION DISTRIBUTION STEN (RIDS) 8411120363 DOC. DATE: 84/11/08 NQTARIZED:
NQ St.
Lucie Planti Unit 2i Florida Power 5 Light Co.
AUTHOR AFFILIATION Florida Power 5 Light Co.
RECIPIENT AFFILIATION Division of Licensing DOCKET ¹ 05000389
SUBJECT:
Forwards "Fuel Rod Axial Growth Evaluationi" per License Condition
- a. c. s. Results of shoulder gap insp h evaluation assure shoulder gap clearance adequate for all future cycles.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR ENCL SIZE:
TITLE:
OR Submittal:
General Distribution NOTES:
OL: 04/06/83 05000389 RECIPIENT ID CODE/MANE NRR QRB3 BG 01 INTERNAL'CRS 09 ELD/HDS2 NRR/DL DIR NRR/DS I/METH 04 COPIES LTTR ENCL 7
7 6
1 0
1 1
RECIPIENT ID CODE/NANE ADN/LFNB NRR/DE/NTEB NRR/DL/ORAB NRR/DS I/R*B RGN2 COPIES LTTR ENCL 1
0 1
1 0
1 1
1 1
EXTERNAL:
LPDR NSIC 03 05 1
1 1
1 TOTAL NUNBER OF COPIES REQUIRED:
LTTR 26 ENCL 23
k N
" ',.',' I';,,",,",3 i
N W.),v,f )g VNN s
Pl N
N
'.NI I ) ',ll' Vk
. BOX 14000, JUNO BEACH, F I 33408
~/9 ll/
+III>%1%+
FLORIDA POWER 8 LIGHTCOMPANY November 8, 1984 L-84-3I4 Office of Nuclear Reactor Regulation Attention:
Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Eisenhut:
Re:
St. Lucie Unit No. 2 Docket No. 50-389 Axial Growth - License Condition 2.C.5 Shoulder Ga E
ln accordance with License Condition 2.C.5 attached is the St L t N 2
~
~
ucIe nI o.
h ou er Gap valuation Report.
The results of the shoulder gap inspection and t e evaluation assure that the shoulder gap clearance is adequate for all future cyc es.
Very truly yours, J. W. Williams, J.
~
~
~
Vice President Nuclear Energy JWW/RJS/cab Attachment
,841.1.120363 84ii08
'.PDR.ADOCK 05000389 P,"
', "DR '.'
PEOPLE... SERVING PEOPLE