ML17215A331

From kanterella
Jump to navigation Jump to search
Informs That No Addl OL Fee Required for Facility Since Max Fee Already Paid for Issuance of License NPF-16 on 830406
ML17215A331
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/23/1984
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8404090509
Download: ML17215A331 (2)


Text

r Docket No. 50>>389 NR 23 I984 Florida Power 8 Light Company ATTN:

Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Post Office Box 14000 Juno Beach, Florida 33408 Gentlemen:

On April 6, 1983, the Comission issued Operating License NPF-16 (five percent power) for the St. Lucie Plant. Unit 2.

On June 10. 1983, the license was amended to authorize full power (10(C) operation.

As required by 10 CFR 170.21, an operating license fee of $1,024,500 was paid for the issuance of the operating license.

In accordance with Footnote 3 of Section 170.2'l, the costs incurred to issue the St. Lucie operating license have been reviewed and they substantially exceed the maximum fee of $1.024,500 prescr ibed by the Commission regulations.

Since the maximum fee of $1,024,500 for an operating license has been paid, no additional operating license fee is required for St. Lucie 2.

Sincerely.

O~iSinai S~ea bq AVm. O. b5ller William 0. Miller, Chief License Fee Management Branch Office of Administration DISTRIBUTION:

PDR LPDR Manpower File CJHolloway, LFNB

RNDiggs, LFNB
DWeiss, LFMB LFNB R/F 8404090509 840323 PDR ADOCK 05000389 P

PDR osncs~

SURNaMs&

oats~

LFMB:AD DWei 3/ ~~/84 LFMB:

M CJ oway 3/$9-/84 LFMB:ADN WONiller

/84 NRC FORM 318 {10.80) NRCM 0240 OFFICIAL RECORD COPY

h*

p 1 'I L