Docket Ho.:
50-389 PFB i 5 1983 DISTRIBUTION
,. Document Control 50-389m NRC PDR NSIC L PDR PRC System Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408
Dear Hr.Uhrig:
'B83 Reading JLee VNerses
- Attorney, OELD TNNovak ACRS (16)
Subject:
St. Lucie Plant, Unit 2 - Outstanding Engineering and Construction Hork Items Your October 8, 1982 letter (L-82-434) submitted a list of all engineering and construction items (i.e., the hardware items) that were not expected to be completed at core load for our review and comnent.
Our review of your October 8, 1982 letter confirmed the agreed upon and SER documented completion dates.
Completion dates for the other items were found to be acceptable except as indicated below.
1.
Fire Protection.
As previously indicated in our July 26, 1982 letter
'0'o3you, justification as to why relief should be granted for those.
items not to be completed by core load was f'ound to be unacceptable.
Details of our concerns about this matter have been conveyed to FPSL staff in meetings held with the FPGL staff on October 15, 1982, November 30, 1982, December 14, 1982, January 11, 1983 and January 27, 1983.
2.
Boron Dilution Alarms.
The staff found the,FPSL justification not to install the alarms unaccepta')le.
FLSL subsequently 81lbmitted letter L-82-487 dated November 4, 1982 proposing to install'he alarms bp
- December, 1983.
Furthermore, FPSL provided.a justification, which was acceptable to the staff, for why it would be safe to operate the plant without the alarms until they are installed.
3.
Primar Hater Makeu to Volume Control Tank.
The staff noted during discussions with FP5L that the as-built piping configuration may hot be in conformance with the ASME Code and modifications before core load should be considered.
To assure conformance, FPtlL agreed to consider making piping modifications prior to core load.
830225048b 830215 PDR ADOCK 05000389 A
PDR OFFICE/
SURNAME). ~ ~ ~ ~ ~ s ~ o ~ ~. ~ oo ~ ~ ~ o ~ ~
DATEP
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~
~ ~ ~
NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USQ PO: 1981M&960
P EA c
P
1 Dr. R.
E. Uhrig
~
2 e
4.
Environmental uglification Pro ram.
As requested in your letter. the staff is addressing this matter under separate correspondence and will provide our formal response in SS)R 3 to be issued prior to core load.
5.
Post Accident Sam lin S stem.
The staff found the justification unacceptable for having this system completely installed and operational by 5% power.
This was discussed with the FP8L staff.
Subsequently in letter L-82-530 dated December 9, 1982, FPSL committed to change the completion date to initial criticality.
The staff finds this acceptable and our formal response will be in SSER 3 to be issued prior to core load.
6.
Continuous Ox en An~al zen.
The staff f'ound the FPAL )notification acceptable for completing the installation by first refueling provided that when the existing oxygen analyzer becomes inoperable gaseous waste collection header samples are obtained and ana'lyzed by the laboratory gas analyzer for oxygen at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
This interim-requirement will be specified in the St. Lucie, Unit I'lo. 2, Radiological Effluent Technical Specifications.
I understand that the FP8IL staff (is igrqed fo IIjeeh;thas teondition~,.
Please contact Hr. Nerses (301/492-7238),
St. Lucie 2 Project Manager. if you desire any discussion or clarification of the matter discussed in this letter.
Sincerely, cc:
See next gage Original signecI bye'l201Das go tv~
~'homas H. Novak, Assistant Director for Licensing Division of Licensing
- See previous concurrence.
OFFICE/
SURNAME/
DATE IP DL:LB¹3
- DL:LB¹3 *
"GQKn'j:g'hoon'"
~ oooeooo Ps
~
~
~
~ ooo ~ o ~ o ~ooo DL:
~
e ~ Oooee ~ o ~ ~ o ~
aK
~\\ ~ ~
\\ flo~ eo ~ o ~ eo ~ e ~ ~ ~
..2/.. V8.3.........
~ ~ ~ ~ ~ ~ ~ \\ ~ ~ ~ ~ ~ ~ o ~ e ~ ~ ~ o ~ o ~
ee ~ ~ ~ ~ o ~ o ~ e ~ ~ e ~ o ~ e ~ o ~ o ~ ~
~ ~\\ ~ ~ ~ o ~ oo ~ oo ~ o ~ o ~ o ~ o ~ o ~
NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USQPO: 1981~960
%E%
Jl 4e J
I'
rA Dr. R.
E. Uhrig 4.
Environmental uglification Pro ram.
As requested P your letter, the staff is addressing this matter under separate coyrespondence and will provide our formal response in SSER 3 to be iss dd prior to core I1oad.
5.
Post Accident Sam lin S stem.
The staff fo d the justification~for hav ng t is system completely installed an/ operational by 5X power Ttt
>> ~f ff t ftt tt fftt ff Subsequently in llutter L-82-530 dated December 9,
- 1982, FP8L committed to change the coygletion date 'tfo initial critical-ity.
The staff finds this acceptabj4 and our formal response will be in SSER 3 to be issued prior to co e load.
6.
Continuous 0
en Anal zer.
Th staff found the FPSL;-justification acceptable for completing thegnstallation by first refueling provided that when the existing oxygen'nalyzer becomes inoperable gaseous waste collection header samples re obtained and analyzed by the laboratory gas analyzer for oxygen a
least once 'p'er 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
This interim requirement will be spec) ied in the St. Lucie, Unit No.
2', Radiological
. Effluent':TTechnical S'p'e ffications.
I understand that the FPSL staff (Carier) has agreed t meet this condition.
Please contact Mr. Ners s (301/492-7
, St. Lucie 2 Project Manager, if you desire any discuss on or) clarification of the matter discussed in this letter.
Sincerely, cc:
See next page Distribution:
Document Control 50-389 NRC PDR L PDR NSIC PRC System LBk'3 Reading File
- BPaton, ELD TNovak ACRS (16)
GKnighton VNer ses JLee
- EJordan, IE
- JTaylor, IE Thomas M. Novak, Assistant Director for Licensing Division of Licensing OFFICE/
SURNAME)
OATE $
V f'
ph 12/9 > /82 D
t G
ton 12/P /82 DL'AD:L TNovak 12/
/82 NRC FORM 318 (10.80) NRCM 0240 OFFICIAL RECORD COPY US 0 P01 1981-33&980,"
4
,1 1
\\
1
Dr. Robert ED Uhrig, Vice President Advanced Systems and Technology Florida Power
& Light Company P.
0.* Box 14000 Juno Beach, Florida 33408 Harold F. Reis, Esq.
Lowenstein, Newman, Reis, Axelrad
& Toll 1025 Connecticut Avenue, N.'M.
'Washington, D.
C.
20036 Norman A. Coll, Esq.
Steel Hector
& Davis 1400 Southeast First National Bank Building
.Miami, Fl ordia 33131 Mr. Martin H. Hodder 1131 N.
E. 86th Street Miami, Flordia 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 South,A1A Jensen Beach, Flordia 33457 Regional Adminstrator Region II
~
U.
S.
Nuclear Regulatory Commission 101 Marietta Street Suite 3100 Atlanta, Georgia 30303
~
~
~
H
~
~
P
'7