ML17213B039
| ML17213B039 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/08/1983 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0654, RTR-NUREG-654 L-83-56, NUDOCS 8302170336 | |
| Download: ML17213B039 (4) | |
Text
ACCESSION NBR FACIL:50 389 AUTH INANE UHRIGg R ~ E ~
REC IP ~ NAME EISENHUTi Di G REGULATORY ORMATION DISTRIBUTION SY~
0 (RIDS) e 8302170336 DOC ~ DATE: 83/02/08 NOTARIZED:
NO St ~ Lucie Plant~
Unit 2i Flor ida Power 8 Light Co.
AUTHOR AFFILIATION Florida Power 8 Light Co, REC IP IENT AF F ILI AT ION Division of Licensing DOCKET 05000389
SUBJECT:
Informs control control in Unit that hard copy readout will be provided in Unit 2
room.Mod consists of feeding signal from Unit 1
room meterological cabinet into six channel recorder 2 control room via te'lehone linc'ISTRIBUTION CODE:
8001S COPIES RECEIVED:LTR g ENCL /
SIZE:
TlTLE: Licensing Submittal:
PSAR/FSAR Amdts 8, Related Co> respondence NOTES:
RECIPIENT ID CODE/NAME A/D LICENSNG LIC BR N3 LA COPIES LTTR ENCL 1
0 1
0 RECIPIENT COPIES ID CODE/NAME LTTR ENCL LIC BR 03 BC 0
NERSESi V ~
01, 1
1 INTERNAL: ELD/HDS2 IE/DEP EPOS 35 NRR/DE/AEAB NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 2Q NRR/DHFS/HFEBOO NRR/DL/SSPB NRR/DS I/ASB NRR/DSI/CSB 09 NRR/DS I/METB 12 22 REG 04 HM/D D A M I /MI8 EXTERNAL: ACRS 41 DMB/DSS (AMDTS)
LPDR 03 NSIC 05 0
1 1
1 0
2 2
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 1
1 1
1 0
6 6
1 1
1 1
1 1
IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 1 1 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DS I/AEB 26 NRR/DS I/CPB 10 NRR/DSI/ICSB 16 NRR/DSI/PSB 19 NRR/DSI/RSB 23 RGN2 BNL(AMDTS ONLY)
FEMA"REP DIV 39 NRC PDR 02 NTIS 1
1 3
3 1
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 3
3
,TOTAL NUMBER OF COPIES REQUIRED:
LTTR 52 ENCL 05
I'I I
It It II
'I
't It Jtl
/
P OX 14000, JUNO BEACH, FL 33408 i%I /
FLORIDA POWER & LIGHT COMPANY February 8, 1983 L-83-56 Office of Nuclear Reactor Regulations Attention:
Hr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Hr. Eisenhut:
Re:
St. Lucie Unit No.
2 Docket No. 50-389 Compliance With Interim Criteria of NUREG 0654 By letter L-82-516 dated November 24, 1982, Florida Power and Light Company (FPL) provided information regarding compliance with the interim criteria of NUREG 0654.
The letter indicated that prior to installation of the Safety Assessment System in the Unit 2 control room, meteorological data will be accessible from the Unit 2 control room by telephone.
The NRC staff has reviewed the information provided and requires that as an interim measure a hard'copy readout be provided in the Unit 2 control room in lieu of telephone communications.
The parameters required include wind
- speed, wind direction and temperature at the 32'nd 190'et tower elevations.
Therefore, FPL will provide the hard copy readout in the Unit 2 control room.
This modification will consist of feeding signals from the Unit 1 control room meteorological cabinet into a 6-channel recorder in the Unit 2 control room via a telephone line.
This modification will be completed by core load.
If there are any questions regarding this submittal, please contact us.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems and Technology Attachment REU/RJS/JES/cab 8302i703M,'880208 pop 'gloocv, ooooosa9.
cc:
J.
P. O'Reilly, Region II Harold F. Reis, Esqui're goOI PEOPLE...SERVING PEOPLE
4I la