ML17213B010
| ML17213B010 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 01/06/1983 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Wethy C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8301250122 | |
| Download: ML17213B010 (2) | |
Text
January 6, 1983
~ SO.ktxzeypg Florida Power and Light Company ATTN:
Mr. C.
M. Wethy Plant Manager St. Lucie Plant P. 0.
Box 128 Ft. Pierce, FL 33450
Dear Mr. Wethy:
This letter is in response to your request of November 15, 1982, for exemption from NRC administered Requalification Examinations for the St. Lucie staff for the year 1982.
Since we were unable to begin administering these examinations in October 1982, as originally scheduled, an exemption is not necessary.
I have discussed our 1983 Requalification Examination Plans with your training staff during our site visit the week of December 6, 1982.
If you have any further questions concerning this matter, contact me at (404) 221-5542.
Sincerely, bcc:
Document Management Branch NRC Resident Inspector State of Florida (Original signed by BAWilson)
Bruce A. Wilson, Chief Operator Licensing Section Division of Engineering and Operational Programs RII B)lilson:es g./P/8$
RI I AFGibsoy I)e i~
RII HC ance 1/~~ /83 8301250122 830106 PDR ADOCK 05000335, V
- PDR, i
lt U
I I