Forwards Review Comments on Proposed License Amend of Fire Protection Tech Specs.Amend Unacceptable Due to Deviations from STS W/O Sufficient Justification.Revised Amend Requested.Detailed Comments Encl
ML17213A674
Person / Time
Site: Saint Lucie 
Issue date: 10/27/1982
From: Clark R
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8211110023
Download: ML17213A674 (6)


Text

~'CT 87 1982 Docket Ho. 50-335 Dr. Robert E. Uhrig Vice President Advanced Systems

& Technology Florida Power 5 Light Company P. 0. Box 529100

t1iami, F 1 oneida 33152

Dear Dr. Uhrig:

DISTRIBUTION:

~ocket File L PDR NSIC ORB¹3 Rdg DEigfghut JHeltemes OELD ELJordan JNTaylor ACRS-10 RAClark PNKreutzer-3 DWagner EConner Gray File P

Q3 Olk By letter dated May 6, 1981 you responded to our letter of'ebruary 4, 1981 which requested that Flot.'ida Power 5 Light Company propose Tech-nical Specification changes to incorporate the fire protection modifi-cations completed during 1980 at the St. Lucie Plant, Unit No. 1.

We have reviewed the proposed amendment and find it unacceptable due to the deviations, with insufficient justification, from the Standard Technical Specifications.

Enclosed are our comments elaborating on these deviations.

Due to the complexity and exten't of these review

comments, we request that you submit a revis'ed license amendment which addresses these
items, In recent communications with f)r. Ronald Stevens of your staff, a mutually agreed upon schedule for you} resubmittal has been determined.

Therefore, our review schedule has been revised to expect your response within 60 days from the date of this lette~.

The information requested in this letter affects fewer than 10 respondents; therefore Ot)B clearance is not requieed under P. L.96-511.

Sincerely, 0:>8 oal stoned by Robe~ X e)ark Robert A. Clar',k', Chief Operating R!eactors Branch ¹3 Division of Licehsing

Enclosure:

As stated cc:

See next page 82iiii0023 82i027 PDR ADOCK 05000335',

PDR OFFICES SURNAME) oATE> 1 AXL82 NRG FORM 318 u0-80) NRCM 0240

.1.04'.l/82.....,.

ORB 3:D ORB

QL tzer Dl R/pn ORB¹3:DL ORBP

'gneRN RAClark

~

0 ~ 0 ~i~ 0 ~ ~ ~ ~ 0 ~

F 0'

~ 0 ~ 0 ~ ~ 0 ~ ~ ~ ~

1047l82........

EOtÃl82..

OFFlClAL RECORD COPY USGPO: 1981-335.960

l

~

Florida Power 5 Light Company CC:

Harold F. Reis, Esquire Lowenstein,

Newman, Reis 8 Alexrad 1025 Connecticut Avenue, N.W.

Washington, D. C.

20036 Norman A. Coll, Esquire McCarthy, Steel, Hector

& Davis 14th 'Floor, First National Bank Building Miami Florida 33131 Indian Piver Junior College Library 3209 Virginia Avenue'ort Pierce, Florida 33450 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road

,Tallahassee, Florida 32301

~

I Mr. Weldon B. Lewis

, County Administrator St. Lucie County

'2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtland Street, N.E.

'tlanta, Georgia 30308

'Mr. Charles B. Brinkman

  • Manager - Washington Nuclear Operations C-E Power Systems Combustion Engineering, Inc.

'853 Cordell Avenue, Suite A-1

Bethesda, Maryland 20014 Mr. Jack Schreve Office of the Public.Counsel Room 4, Holland Building'allahassee, Florida 32304 Resident Inspector c/o U.S.N.R.C.

7900 S.

AIA Jensen Beach, Florida 33457 State Planning and Devel pment Clearinghouse

, Office of Planning and Budgeting Executive Office of the Governor The 'Capitol Building Tallahassee, Florida

. 32301 Regional Administrator Nuclear Regulatory Commission, Region II Office'of Executive Director for Operations 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

~pit RB4III~

e +>>*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ENCLOSURE A.

REVIEW 'COIiY(ENTS ON PROPOSED LICENSE AHENDMENT FIRE PROTECTION TECHNICAL SPECIFICATIONS

'"'T.'UCIE UNIT '1 '" DOCKET NO. 50-3'35 e ~

Technical S ecificatioii" TS Section 3.3.3=-.7 - Fire Detection

~. '

The Fire dete'ctors'which'activate the-pre-action sprinkler systems for the,.emergency diesel generator rooms are not included in Table 3.3-10 as. required by Standard Technical Specifications (STS)

Table 3.3-11.

These detectors should'be included in the table.

The total minimum number of detectors required by Table 3.3-10 to be operational is too low.

This data should be reeva'luated and revised.to indicate a

more realistic number of operable detectors.

It is recommended that the minimum number of operable detectors per zone be no less than 50;o'f the total detectors installed in that zone.

B TS Section 1/4.7.11.1 Water System J

Revise Section =3.7.. 11. l.c lines fo'ur through six to read: "....hydrants, the last valve ahead.'of each hose standpipe riser, and the last valve ahead of the spray and/or sprinkler.

system required to be operable per Sections

3. 7. 11. 2, 3.7.. 11.3 and 3.7. $ 1.4."

This change is 'equired because the sprinkler systems and yard hydrants have been incorporated into the Technical Specifications.

C.

TS Section.3/4.7. 11.2 - Fire Hose Stations

~

'Revise ActioII Item a to conform to STS Section 3.7. 11.5 as to the

.ime required to provide supplemental protection and in the reoortirg reouirements.

2.

Revise Table 3.7-3 to include all fire hose in the safety related areas.

For

example, hose station HS-15-32 located in the cable spreading room is not listed. in the table.

3.

Revise the surveillance section to require all fire hose on the exterior hose stations to be hydrostatically tested annually.

This is required by 10 CFR 50 Appendix R Section III.E.

D.

TS Section 3.7. 11.'3 - Fire HydraIets 1.

Based on St.

Lucie Unit f Fire Protection Reevaluation Report of triarch 31,

1977, Table 3.7-4 do'es not appear to include all of the fire hydrants required to provide secondary fire protection for all safety

'elated areas of the plant.

This hydrant list, should be reevaluated and the necessary changes made where reouired.

~

~

~

g+ ~'.

The note at the bot-om of Table 3.7-4 should be deleted.

E.

TS Section3/4.7. 11.4 S rinkler S

stems 1.

Revise this section to identify the two pre-action sprinkler systems installed in the diesel generator building.

2.

"Action Item A" should be revised to conform to the STS.

3.

Revi.se Section 4.7. 11.2.a to require the position of the

.sprinkler'ystem control valves to be verified each 31 days as stipulated by the STS.

.4.

Section 4.7;11.2 should be renumbered 4.7. 11.4

. F.

TS Section 3/4.7. 12 - Penetration Fire Barriers Revise this section to include all fire barrier penetrations as defined'by the STS.

~

~