NOV 3 1982 Docket No..:
50-389 APPLICANT:
Florida Power and Light Company (FP&L)
FACILITY:
St. Lucie Plant, Unit 2
SUBJECT:
SURNRYj..OF MEETING HELD IN BETHESDA, MARYLAND WITH FP&L ON OCTOBER 29, 1982 REGARDING ENVIRONMENTAL QUALIFICATION (EQ)
ITEMS A meeting was held on October 29, 1982 between the NRC and FP&L to discuss EQ items and the course of action needed to resolve outstanding issues.
A summary of the results of this meeting is given below.
1.
FP&L will provide a descriptiono6FI>how the heat flux, (Q/A) was calculated for the solenoid valve.
2.
Thermal lag analysis does not appear to consider if a spectrum of break sizes will conservatively envelope the temperature and heat flux conditgons that might occur for a small break.
FP&L will provide clarification.
3.
FP&L will provide a description of the effects of thermal shock on the solenoid used in the thermal lag analysis.
FP&L will answer the question of whether thermal shock is a problem with a high ramp transient that is expected in a worsh case main steam line break.
4; NRC will randomly select three pieces of. mechanical equipment to be audited fItIr environmental qualification review.-
FP&L will provide the specifjcation.crgteria+a drawing of the component including, materi al s identi fica Uion ouse'nvironmental ly'ensi tiVe'oiateii al "==~
in each component and the justification for the environqental
- qualification (vendor info, test reports, etc.).
5.
~FPSL will provide-more'pec'ific inforpation.on the.justificatio~, for interim operation and include as much detail as possible to address the five categories of information requested in the SER.
This specific information should demonstrate why the equipment may be considered acceptable for interim operation.-
Test conditions should be clearly specified.
"<",est results should be provided to support the conclusions.
If this qualification testing information cannot be provided then a
failure modes and effects analysis must be performed to demonstrate that the plant can be satisfactorily operated if the equipment were to experience fai lure.
82iii00054 82ii03 PDR ADOCK 050003819I I81 PDR OFFICE/
SURNAME$
DATEf
~ 0 ~ 0 ~ ~ ~ ~ ~I~ ~ 0 ~ 0
~ ~ 0 ~ ~ ~
~ ~ ~I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~I~ ~ ~ ~
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ 0 ~ 0'
~ 0
~
~ ~ ~ ~ ~ ~ ~ 0 ~I ~ 0 ~ ~ ~t ~I ~ ~ ~
~
NRG FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1981~960
'k N
P
r
~~
Florida Power
& Light Company 6.
FP8L will make a statement that post accident aging is not used to qualify a component for pre-accident aging conditions for all equipment in a harsh environment',.~
7.
FP8L provided a list of TtfI equipments for staff review.
Enclosure:
est of Attendees cc:
See next page Victor Herses, Project ffaeg;er Licensing Branchy/Ho.
3 Division of Licensing OFFICE/
SURNAME$
DATE 5 "T17M/82"-'L ghton "1'17/782""'
~ ~
~ ~ ~
NRG FORM 318 (10-80) NRCM 0240 OF F ICIAL R ECO R D COPY USGPO: ISSI-33&960
t i
+'
ST.
LUCIE Dr. Robert E. Uhrig, Yice Pres ident Advanced Systems and Technology Florida Power 8 Light Company P. 0.
Box 5291000 Miami, Florida 33152 Harold F. Reis, Esq.
Lowenstein, Newman, Reis, Axelrad
& Toll 1025 Connecticut Avenue, N.W.
Washington, D.
C.
20036 Norman A. Coll, Esq.
Steel Hector 5 Davis 1400 Southeast First National Bank Building Miami, Flordia 33131 Mr. Martin H. Hodder 1131 N. E. 86th Street Miami, Flordia 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 South A1A Jensen Beach, Flordia 33457 Regional Adminstrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street Suite 3100 Atlanta, Georgia 30303
Attendees October 29, 1982 NRC Staff Y. Nerses B. LaGrange J.
Kennedy Florida Power 5 Li ht Com 'an J. Franklin J. Sheetz
Document Control NRC PDR L PDR NSIC TERA-389)
MEETING
SUMMARY
NOV g
<8p LB83 Reading J.
Lee G. Knighton
'roject Manager
- Attorney, OELD E.
L. Jordon Regional Administrator, Region J.
M. Taylor PARTICIPANTS NRC VNerses
'LaGrange JKennedy
~
~
~
\\
, ~
IP e
4