APR 1P 1902 Dock'et No. 50-335 Dr. Robert E. Uhrig Vice President Advanced Systems
& Technology Florida Power &.Light Company P. 0. Box 529100 Niami, Florida 33152 DISTRIBUTION:'
Bocket File NRC PDR L PDR NSIC ORB83 Rdg DEisenhut JHeltemes OELD I&E ACRS-10 PNKreutzer-3 RAClark CNelson Gray File P<pcpp; @
e~,
tg8Z~
pppg.g PP7 ~~
/g p~i~l Q
Dear Dr. Uhrig:
Based on our review of your submittals regarding the St. Lucie Unit 1 OVgrpressure Hitigation System, primarily your letters of April 13, 1978 (L-78<<129) and June 29, 1978 {L-78-223), we have determined that the additional information identified in the enclosure is necessary to con>>
tinue our review.
Please provide this information by foray 17, 1982.
OHB clearance is not required for this request since it is being trans-mitted to fewer than ten addressees.
Sincer ely, 6rI@gq~~
~g!'@~cta+>1+~r Robert A< Clark, Chief Operating Reactors Branch 83 Division of Licensing
Enclosure:
As stated cc:
Seen',ext page 8205050528 820412 PDR ADOCK 05000335 P
PDR OFFICEN SURNAME$
CATE Ia ORB 3:
L P
eu zer
. OJS.JBZ.......
ORB83:DL
~ Oa ~ 0 ~
pn
~
~ ~
~ ~ ~ ~ ~ ~ a ~ a ~ ~ a ~ aaaa ~ ~
4 6/82
...L... !
~ ~
~ Iwel ~ 0 ~ 0 ~ 0 ~oato RSBISI
~ ~ ~ ~ ~ ~ ~
0 ~ 0 ~ 0 ~ 0 ~ 00 ~ 0 ~
ORBig3:DL RACl ar@)
4/ It/
~ 0 ~I~ 0 ~ lent ~ ~ 0 ~
~I
~ ~ ~ ~ ~ ~ ~I ~ ~ 0 ~ OOHO ~
~ ~
4(/p-/82
~
~I~ 0 ~ 0 ~I~ 0 ~ ~ ~ ~
~
~ ~ ~ ~ ~I~ 0 ~ ~ ~ ~ a ~ a ~ 0 ~ ~ 0 ~ ~ ~
~ ~ 0 ~ ~ 0 ~ ~ 1 ~ 0 ~ 0 ~ 00 ~ a ~ 0 ~ ~ ~ ~
NRC FORM 318 (10.80) NRCM 0240 OFF ICIAI R ECO R0 COPY USQPO4 1981~960
I R
C
. ~
+lorida Power 8 Light Company
~
CC:
Harold F. Reis, Esquire Lowenstein,
- Newman, Reis 8 Alexrad 1025 Connecticut
- Avenue, N.W.
Washington, D. C.
20036 Norman A. Coll, Esquire McCarthy, Steel, Hector 8 Davis 14th Floor, First National Bank Building Miami Florida 33131 Indian Piver Junior College Library 3209 Virginia Avenue Fort Pierce, Florida 33450-Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewib County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce,'lorida 33450 U.S. Environmental Protection Agency Region IV Office
. ATTN:
Regional Radiation Representative 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Mr. Charles'B.
Brinkman.
Manager - Washington Nuclear Operations C-E Power Systems Combustion Engineerin'g, Inc.
4853 Cordell Avenue, Suite A-1
- Bethesda, Maryl.and 20014 Mr. Jack Schreve Office of the Publ'ic Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector/St.
Lucie Nuclear Power Station c/o U.S.N.R.C.
P. 0.. Box 400 Jensen Beach, Florida 33457 Bureau of Intergovernmental Rel ations 660 Apal ach'ee Parkway Tallahassee, Fl orida 32304 Regional Administrator Nuclear Regulatory Commission, Region II Office of Executive Director for Operations 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
~ p
~
~
ENCLOSURE ST.
LUCIE, UNIT 1
RE VEST FOR ADDITIONAL INFORMATION l.
Branch Technical Position, RSB 5-2 (Attached), requires the Overpressure Mitigating System (OMS) to perform its function with a single'ailure when the initiating event is not considered as the single active failure.
Please address the following postulated event:
Consider the initiating event to be the loss of a DC control bus that isolates letdown flow and also violates the operability of one
.PORV.
Then consider the failure of the other PORV as your single OMS failure.
2.
Item 4 of 'Branch Technical
- Position, RSB 5-2, requires the OMS be tested to assure operability prior 'to each shutdown.
a.
Is this testing being performed prior to each shutdown?
How are the OMS setpoints verified prior to shutdown and rev'erified monthly while RCS temperature is <275'F7
,.3.
,The staff requirement that a report be submitted to NRC of all OMS (PORVs or SCS safety valve) operations to relieve pressure transients in the RCS is not included in your technical specifications as amended by your letter of April 13, 1978.
Address this requirement.
4.
In your letter of February'28,
- 1977, you stated that all of your operators will have completed a review of causes of past overpressure transients by April 8, 1977.
t c
a+
r l
a.
What overpressure protection training have you performed since mid-1 977'?
b.
How do you ensure a continued emphasis is placed on possible overpres-surization situations in your. licensing and retrain'ing" programs?
c;.
How is this training and LER review documented
~
A
~
5; What is the present status of the St. Lucie Unit 1
OMS'?
A V