Forwards Auxiliary Feedwater Sys Evaluation in Response to 820218 Request for Addl Info Re NUREG-0737,Item II.E.1.1
ML17212B462
Person / Time
Site: Saint Lucie 
Issue date: 03/15/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Clark R
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.1, TASK-TM L-82-94, NUDOCS 8203230491
Download: ML17212B462 (6)


Text

DOCKET 05000335 REOUL'A'TORY QIFORMATION DISTR ISUTION SYN,(RIDS)

'ACCESSION NBR; 8? 03230491 OOC, DATE: 82/03/15 NOTARI'ZEO; NO FACIL::50 335 St ~ Lucie Plant~, Unitt ii Flor ida Power 8 Light Co.

AUTH BYNAME AUTHOR 'AFFILIATION UHRIGJRDE ~

Florida 'Power 8 Light Co,.

RECIP, )<A/1E RECIPIENT AFFIL'IATION

<<CLARKrRD'Ae

.Operating Reactors Branch '3-

SUBJECT:

Forwards--auxiliary feedwater sys evaluation "in response to 820218 nequest,for addi info re NUREG 0737iItem IIDE~ 1 1 ~

DISTRISUTION;CODE<<AOASS iCOPIES 'RECEIVED:LTR

~ j.'[<CL P SIZE TITLE: Response-;to,NUREG

'0737/NUREG 0660."THI Action ',Plan Rgmt<<s (O "s)

NOTES!'ECIPIENT-

<<COPIES IO CaDE/NAME...L'TTR ENCL

.ORB 03 'BC 01 7

l7

'REC IPIENT

'IO <<CODE/NAHE

'COP IES

'I TTR ENCL INTERNALS

,ELD

-IE/OEi OiR IE/DEP/EPLB NRR/DE/ADOSE '22=

NRR/DE/ADSA 17 NRR/DHFS/OEPY29 NRR/DL/ADL 16

,NRR/PL/GRAB

,18 NRR/OSI OIR 24 NRR/OSI/ADPS '25 NRR/OS I/AE8 NRR/DSI/RAB NRR/DST/ADT=.

<<32 RGN2 EXTERNAL: AGRS

'34 INPOgJ,STARNES NRC PDR F 02 NTI'S 1

0 1

3 3

1 1

1 1

1 1

1 1

<<3 1

~ 1 1

1

.1 1

1 1

10 10 1

1 1

1

~ 1:

1

'IE 1'2 IE/DEP/EPOB NRR/DE,DIR "21

.NRR/DE/ADHQE '23 NRR/OHFS DIR ?8

'NRR/DL OIR

. 14 NRR/DL/ADOR

.15 NRR/DSI AORS 27 NRR/DSI/ADGP 31 NRR/DSI/AORP 26 NRR/DSI/ETS8 NRR DI R

<<30 04 FEHA~REP,,DI V

,LPOR 03 NSIC 05 1

1 1

1 1-1 1

1 1

1

.1 1

1 1

1 1

1 1

1 1

~ 1

.1

,.1

.1 1

1 1

1 1:

'TOTAL NUMBER,.OF 'COP IE'8 REQUIRED:

LTTR 54

'>>ENCL

.'53

'4 I

y>>If)

Ik 'I1t 1

1 ht" f 9'k l Ih

,i, ~

! ]

Iln tg ill hhh')I ff)h'Af'h ~, rQQ Ir)h Ir>>r i f

~

n n 4

~ "~ 4, l

)'7 l Ih q L f' X,"Irf >

,)

~

1 n

mrnrnn. 'nnn(-~nnr n tr (gfy f lI'K~,5I

)3f

)I) n

'l ih rh Ii a~I

'](rr)

(

hh I

h

'1

'I $

1 rhrrf I

'f I

1

'kk rj Il h)r Ir N

il

.O. BOX 529100 MIAMI,F L 33152 Sr'A FLORIDAPOWER & LIGHTCOMPANY March 15, 1982 L-82-94 Office of Nuclear Reactor Regulation Attention:

Mr. Robert A. Clark, Chief Operating Reactors Branch g3 U.

S.

Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Clark:

Re:

St. Lucie Unit 1

Docket No. 50-335 Post-TMI Requirements Auxiliary Feedwater System Evaluation NUREG-0737 Item II.E.l.l ii'8 Ii~yi l

~c~Qg

'8jg

@p Pg Pg (gQ)

This letter is in response to your letter dated February 18, 1982 which requested additional information concerning NUREG-0737 Item II.E.l.l.

The responses to your two questions are provided in the attachment to this letter.

We trust that this information will allow you to complete the system portion of your evaluation.

Very truly yours, Robert E. Uhrig Vice President Advanced System and Technology REU/PKG/cab cc:

Mr. James P. O'Reilly, Region II Harold F. Reis,,Esquire 8203230491 820315 PDR ADOCK 05000335 P

,PDR PEOPLE... SERVING PEOPLE

W

~a

~s 1llI

.d 't l

Il

)li g

oh, e

e I

IJ 4

j 1

A

~

0 ff l'

g 4"

~

ll W

~

I II

>,i'e II j

I E

I Ill l

%1 ATTACHMENT Re:

St.

Luci e Unit 1

Docket No. 50-335 Post-TMI Requirements Auxiliary Feedwater System Evaluation NUREG-0737 Item II.E.l.l uestion 1

FPL is requested to describe the connection between the condensate storage tanks and to verify that failure of the Unit 1

CST will not cause loss of water supply to Unit 2 CST.

~Res ense The NRC staff has reviewed and found acceptable the connection between the condensate storage tanks of Unit 1 and Unit 2 in the Safety Evaluation Report for Unit 2 contained in NUREG-0843 dated October 1981.

The connection between the two tanks is described in detail in the SER but is summarized below.

The cross tie of the Unit 2 CST to the Unit 1

CST was installed at the request of the NRC because the Unit 1

CST is not protected from vertical tornado missiles.

The connection is between the Unit 2 CST and the Unit 1 auxiliary feedwater pump suction lines through a protected underground line.

The tap in point is isolated from the Unit 1

CST by check valves so that failure of the Unit 1

CST will not affect the Unit 2 CST.

In addition, the manual valves from Unit 2 to Unit 1 are normally closed under administrative control.

e 2

FPL is requested to verify that procedures for transferring to the Unit 2 CST; as an alternate source of AFW, have been implemented at Unit 1..

Res onse 2

The AFW operating procedure (0700022 Rev.

9) does piovide instructions for supplying Unit 1

AFW pumps from the Unit 2 CST.

A change to also add these instructions to the Emergency Oper ating Procedure

0030142, RCS Cooldown during Blackout has been reviewed by the St. Lucie Facility Review Group.

e

~

4

~

v 4

'iv4 4 I 4 lv

,I tl Iv g

4 44IV v

v 4 W

G G

v Vl 4

~

vr I

4 I W,l,I P

4 iVI.

4,4 v ~

W 4

4 I

V

~ GP W I

'I v

I I

4 I

I "v I

d I

~

v 4

I' 4