ML17212B427
| ML17212B427 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/26/1982 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| L-82-67, NUDOCS 8203080613 | |
| Download: ML17212B427 (6) | |
Text
REGULATORY FO'RMAT ION DISTRIBUTION SY.
M (RIDS)
ACCESSION NBR:8203080613, DOC ~ DATE: 82/02/26 NOTARIZED: NO FACIL:50-335 St ~ Lucie P)anti Uni't iP Florida Power L Light Co ~
AUTH~ NANT AUTHOR AFFILIATION UHRIG E R ~ E ~
Florida Power 8 Light Co ~
RECIP ~ NAME RECIPIENT AFFILIATION EISENHUTED<G.
Division of Licensing
SUBJECT:
Advises of plans to initiate Cycle 6 operation, in early Hay 1983Pw/84 new Exxon assemblies 8,
133, previously irradiated C-E assemblies. List of documents describipg fuel 8 methodology used by Exxon for safety analyses encl'
DISTRIBUTION CODE:
)OOIS
. COPIES RECEIVED:LTR jENCL.
.,SIZF.:
TITLE: Gener al Distribution for af ter Issuance of Operating License NOTES:
DOCKET 05000335
-EXTERNAL: ACRS NRC PDR NTIS 09
'02 RECIPIENT ID CODE/NAME ACTION:
-01 INTERNAL: ELD NRR/DHFS DEPYOB NRR/DL/CRAB 04 COPIES LTTR ENCL 13 13 1
0 1
"0 1
1 10 10 1
1 1
1 RECIPIENT ID CODE/NAME IE NRR/DL D IR NRR/DS I/RAB V
LPDR NSIC 06 03 05 COPIES LTTR ENCL
'2 2
1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 35 ENCL 33
0
'sM I
~I ht w
t 1
~
1I h
R
'I M
~'I
P,.O. BOX 529100 MIAMI,F L 33152 g)llgqi PI>> -~i FLORIDAPOWER & LIGHTCOMPANY February 26, 1982 L-82-67 Office of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Eisenhut:
ggq+~4ipg e6p~
>o,P~,
RE:
St. Lucie Unit 1; Docket No. 50-335 Use of Exxon Nuclear Puel in cle 6 In early May 1983 we plan to initiate Cycle 6 operation with 84 new assemblies provided by the Exxon Nuclear Company (ENC) and 133 previously irradiated assemblies provided by Combustion Engineering.
Safety analyses and fuel management services for Cycle 6 willbe performed by ENC.
Documentation describing the fuel and the methodology used by ENC in providing the safety analyses and fuel management services are listed in the attachment to this letter. The status in regard to regulatory action needed for St. Lucie Unit 1 Cycle 6 is also included in the listing. Those documents which are not yet approved by the NRC were discussed with members of the NRC staff during our meeting of January 13,1982 in Bethesda.
We request that you schedule your reviews to permit approval of all these reports on or near the indicated schedule.
We do not expect to identify any unreviewed safety questions from the use of the ENC fuel or from the Cycle 6 analysis performed by ENC.
Thus, for Cycle 6 we plan to reload and resume operation of the plant not requesting your prior approval in accordance with the provisions of 10CFR 50.59.
Please contact us ifyou have any questions or comments regarding this matter.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems and Training cc:
Mr. J. P. O'Reilly, Region II Harold P. Reis, Esquire 8203080613 820226
- PDR ADOCK 05000335r P .'.
~'pDR:r PEOPLE... SERVING PEOPLE
II tl g Pg g
I lt C>g "I I
1 n'
~ 9 P
gp
~
1 N'.
P l'Jfi" 'Pt '/ i<i'
~ = s')
sl I'
DOCUMENT NUMBER DOCUMENTS DESCRIBING EXXONNUCLEAR DESIGN ANDANALYSISMETHODOLOGY To be Used for St. Lueie Unit 1 Cycle 6 DATES SUBMITTED APPROVAL TlTLE TO NRC NEEDED FOR CYCLE 6 XN-75-27, Supp. 1@2 XN-NP-507 XN-75-48 XN-74-5, Rev.1 XN-209 XN-75-32, Supp. 1*2 XN-75-41 XN-76-27 Exxon Nuclear Neutronie Design for Pressurized Water Reactors ENC Setpoint Methodology for C.E.
Reactors Definition and Justification,of Exxon Nuclear Company DNB Correla-tion for PWR's Description of the Exxon Nuclear Plant Transient Simulation Model for Pressurized Water Reactors (PTSP WR)
Densification Effects on Exxon Nuclear Pressurized Water Reactor Puel Computational Procedures for Evaluating Fuel Rod Bowing Exxon Nuclear Company WREM-Based Generic PWR ECCS Evaluation Model Exxon Nuclear Company WREM-Based Generic P WR ECCS Evaluation Model Update ENC WREM-II June 1975 Approved Approved for Fort Calhoun Approved for Previously Licensed P WR's Approved for Previously Licensed P WR's Approved May 1982 Approved Approved XN-NP-78-30 Exxon Nuclear Company WREM-Based Generic P WR ECCS Evaluation Model Update ENC WREM-IIA Approved XN-NP-81-22 Generic Statistical Uncertainty Analysis Methodology May 1981 February 1982 XN-NF-81-58 XN-NF-82-06 Puel Rod Thermal-Mechanical Response EvaluationModel (RODEX2)
Aug. 1981 Qualification of Exxon Nuclear Company Fuel for Extended Burnup Feb. 1982 June 1982 Sept. 1982 XN-NP-82-20 Exxon Nuclear Company Evaluation Model EXEM/PWR ECCS Model Update Feb. 1982 Supplement Example Problem for C.E. Reactors Aug. 1982 July 1982 Oct. 1982 XN-NP-82-09 Generic Mechanical Design for Exxon Nuclear 14x14 Reload Puel for C.E. Reactors Oct. 1982 Jan. 1983 XN-NF-621 Supplement Exxon Nuclear DNB Correlation for PWR Fuel Designs Extension of DNB Correlation Feb. 1982 May 1982 Oct. 1982 Oct. 1982
0 M'
P