ML17212B420
| ML17212B420 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/26/1982 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| L-82-69, NUDOCS 8203040365 | |
| Download: ML17212B420 (6) | |
Text
,il I
REGULATOt
)FORMATION DISTRIBUTION EM (RIDS) i ACCESSION NBR:8203040365 OUTDATE: 82/02/26 NOTARIZED:
NO FACIL:50-389 St, Lucie PlantE Unit 2> Florida Power 8 Light Co.
'j'UTH,NAME AUTHOR AffILIATION UHRIGP R ~ E, Florida Power L Light Co.
REC IP ~ NAME RECIPIENT AFFILIATION EISENHUTED R Division of Licensing
SUBJECT:
Submits update for const/startup progress for Jan 1982
'ISTRIBUTION CODE:
BOO IS COPIES RECEIVED:LTR L ENCL j SIZE:
TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:
DOCKET 05000389 RECIPIENT ID CODE/NAME ACTION:
A/D LICENSNG LIC BR 0'3 LA INTERNAL: ELD IE/DEP/EPDB 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DE/SAB 24 NRR/DHFS/HFEB40 NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DSI/CPB 10 NRR/DSI/ETSB 12 NRR/DSI/PSB 19 NRR DSI/RSB 23 G F 04 EXTERNAL: ACRS FEMA-REP DIV 39 NRC PDR 0?
NTIS COPIES LTTR ENCL 1
0 0
1 0
1 1
1 0
3 3
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
16 16 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LIC BR 0$
BC NERSESEY
~
01 IE 06 IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DSI/ASB 27 NRR/DS I/CSB 09 NRR/DSI/ICSB 16 NRR/DS I/RAB 22 NRR/DST/LGB 33 BNL(AMDTS ONLY)
LPDR 03 NSIC 05 COPIES LTTR ENCL
,1 0
1 1
'l 3
3 3
3 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 63 ENCL 58
~
4 4
'll r
44
) ~
- CII, pcs i II 4I 4
I ll I4 N
P.o. BOX 529100 MIAMI,F L 33152 0
tnt FLORIDAPOWER & LIGHTCOMPANY February 26, 1982 L-82-69 Office of Nuclear Reactor Regulation Attention:
Mr. Darrell G. Eisenhut,, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Eisenhut:
Re:
St. Lucie Unit 2 Docket No. 50-389 Construction Start-u Pro ress U date Attached is a report of the construction/start-up progress for St.
Lucie Unit 2 for January, 1982. If you have any questions regarding the attached inf'ormation, or would like additional information from Florida Power III Light Company (FPL), please feel free to call me or W. B. Derrickson, the St. Lucie Unit 2 Project General Manager (305) 552-4659.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU:RAK:cf Enclosure RFCL";tVEQ Ol MAR 03 1982~
>wee~
44Ql IIimngtg lo ec cc:
William H. Lovelace, Office Management 8 Program Analysis U. S. Nuclear Regulatory Commission J.
P. O'Reilly, Regional Administrator, Region II Harold F. Reis, Esquire (yP 8203040388 820228 PDR *DOCK 08000388 R
,PDR PEOPLE... SERVING PEOPLE
~p G:LIiy CPU)- 4'
~0~~-ecgpf p() RAM p,~~(a )i ~~j fy>@~I!t!
CCT
~9/7;.>.r'~" cC
RIDA POWER
(<<<< LIGHT COMPANY
<<ST.
UNIT 2 CONSTRUCTION/STARTU BIMONTHLY STATUS REPORT
,CURRENT PERIOD:
January 1982
)SCHEDULE STATUS:
Overall Project Construction/Start-up Critical Path Variance Target Fuel Load Date 84.0 5 82.0 g
-4.0 Weeks 10/28/82
)MAJOR WORK HIGHLIGHTS:
SCHEDULED ACTUAL 1.
Start Emergency Core Cooling Flow Test 2.
Initial Run of Diesel Generator 3.
Completed Insulating Open Blowdown Heat Exchanger 4.
Completed Reactor Seal Ring 5.
Completed Grouting of the Turbine Generator Exciter 6.
Construction Completed Work on System 26A, Generator Seal Oil 7.
Construction Completed Work on System 20, Secondary Sampling 01/04/82 01/13/82 12/28/81 01/11/82 07/10/81 10/30/81 11/30/81 01/13/82 01/22/82 01/29/82 01/07/82 01/05/82 01/13/82 01/29/82 BULK QUANTITY STATUS:
QUANTITY CURRENT TOTAL MONTH TO DATE QUANTITY QUANTITY PERCENT 01/31/82 AVERAGE MONTHLY INSTAL. RATE (QTY/MO)
--10% - 90%
01/82 TO DATE FORECASTED tConcrete (cy)
Large Bore Piping (lf)
Small Bore Piping (lf)
Instrument Tubing (lf)
Large Bore Hangers (ea)
Whipping Restraints Cable Tray (lf)
Conduit (Exp<</
Emb<</ U/D)(lf)
Lighting Conduit Power Cable Pull (lf)
Control Cable Pull (Inc.
Comm. ) (lf)
Signal Cable Pull (lf)
Terms - Pwr:;Hi (ea)
Terms - Pwr Lo (ea)
Terms - Control (ea)
Terms - Signal (ea) 136,500 73,950 77,235 77,746 3( 182 477 39,421 321(717 95,873 412,293 1,472,834 6021062 482 8,074 35,122 10,632 98.3 94.2 81.7 76.4 72.6 80.8 97.0 90.4 82.5 72.0 67.1 44.8 86.1 79.4 47.1 20.3 ESSENTIALLY ESSENTIALLY 1,502 3,349 57 1
ESSENTIALLY ESSENTIALLY 807 3,110 27,198 76,719 21 882 747 483 COMPLETE COMPLETE 3,760 4,220 100 25 COMPLETE COMPLETE 2(220 22/190 891530 42(530 30 540 2/300 1,080 4,400 4,155 135 25 2(060 25(215 90/790 44/455 25 315 3/480 3(535 START-UP PROGRAM STATUS:
Preoperational Test Proced.
Preoperational Test Performed PTO CTO ISCHEDULED TO DATE 202 35 211 89 COMPLETED TO DATE 197 8
178*
48*
SCHEDULE FOR MONTH 5
12 42 36 CURRENT MONTH 0
0/4 1**
21*
18*
TOTAL
'REQUIRED'02 202 299 164
- NOTE:
Includes Packages in signoff circuit
- NOTE:
Included preops in progress
4 f~ -~
~ I
'I
'I J
P
\\
I 4'
-'c P
I