ML17212B351
| ML17212B351 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 01/18/1982 |
| From: | Miraglia F Office of Nuclear Reactor Regulation |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8202030277 | |
| Download: ML17212B351 (8) | |
Text
DISTRIBUTION:
~<N 18 tgeg Docekt File 50-389 LPDR PDR NSIC TERA LB83 Files DGEisenhut SHHanauer Dr. Robert E. Uhrig, Vice President RVollmer o~
Advanced Systems 8 Technology RMattson Florida Power 5 Light Company HThompson 5'.
- 0. Box 529100 RTedesco
@g,ce~<o Iliami, Florida 33152 FMirag 1 ia
~ QQs p
VNerses
Dear Dr. Uhrig:
JLee a~+~ gi% +
RHartfield, M
Subject:
St. Lucie Plant, Unit 2 ER - Request for Ad al Info t
From the review of your su mittal on the proposed additiona pipeline by the Environmental Engineering
- Branch, we find that we need additional information.
The specific informati on requir.ed is listed in the Enclosure.
OELD OKE (3)
RSamworth MMasnik GLaRoche ACRS (16)
Docket No.:
50-389 Please contact Mr. Nerses (301-492-7318). St. Lucie 2 Project Manager, if you desire any discussion or clarification of the enclosed report.
Sincerely, Responses to the enclosed request should be submitted by January 29, 1982.
If you cannot meet this date, please inform us within seven days after receipt of this letter of the date you'lan to submit your responses.
Enclosure:
As stated E
Frank J. Miraglia, Chief Licensing Branch I'/o. 3 Division.,o'f Licensing cc:
See next page.
8202030277 820ll8 PDR ADOCK 05000389 A
PDR DL:LBg3 Ni@k;j>...
"IiHI82 OFFICE/
SURNAME/
DATEP
..F0K
~....v.l
. qg.....
NRC FORM 318110/80) NRCM 0240
~ ~ 0
~ I ~
~
~
~ ~ ~ ~ ~
~ ~
~ ~
~ ~
~
~ ~
OFFICIAL RECORD COPY
~
~ ~
~
~
~ ~ ~
~ ~
~ ~ ~ 0 0 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~
~
~
I ~ ~ ~ ~ ~ ~ ~
II USGPOl 1980-329-824
(
t c.
tt I
t<<
~ =
t ~
8<
II t.
p 1
t t
't t
1 r
t' I
\\
4 I
N t
n t"
I tt t
yirg" A
I
ST LUCIE Dr. Robert E.. Uhrij, Vice President Advanced Systems and Technology
. -Florida Power 8 Light Company
-P. 0.
Box 52910Q Miami, Florida 33152 Harold F. Reis, Esq.
Lowenstein',
Newman, Reis, Axelrad 8 Toll 1025 Connecticut Avenue, N.M.
D.C.
20036 Norman A. Coll, Esq.
Steel Hector 5 Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Martin H. Hodder 1131 N. E. 86th Street Miami, Florida 33138 Resident Inspector St. Lucie Nuclear Power Station c/o U. S. Nuclear Regulatory Commission 7900 South AlA Jensen Beach, Florida 33457
a I ~
~
\\
S'E.
LUCIE 2 ER.OL, DOCKET NO. 50-389 ENVIRONMENTAL ENGINEERING BRANCH a
REQUEST FOR ADDITIONAL INFORMATION ON THE PROPOSED THIRD INTAKE PIPELINE FOR THE ST.
LUCIE PLANT UNIT 2 291.1
'he discussion of the difficulties experienced in'maintaining flows introduces uncertainty, as to what the actual cooling water flow will be with two units in service.
1fith the new intake in service what will the flow be.through each unit2 Mill this be maintained by throttling back pumps2 Apparently higher flows could be employed.
At what reduced flow and corresponding elevated temperature rise will intake pipeline cleaning procedures be initiated2 291. 2 Discuss recirculation of discharged water to the new intake pipeline.
'at\\
291. 3 Page 10 of.the Circulating hater System Modification document provides some flow velocities in the pipelines.
Indicate whether these'velocities are applicable to clean pipe or to fouled pipe-Explain-why the m'aximtfm flow velocity would be reduced to" 2/3's of the'win pipeline I
velocity when the existing pipelines are 12" in diameter and new pipeline is to be 16~ in diameter.
flow the 291
~ 4 Provide estima'tes of flow velocities at the entrance of each velocity
- cap, each vertical pipe section of the velocity cap, each intake
- pipeline, and the intake canal under one and two unit operation and clean and fouled conditions.
291.5 Describe the procedures for removing a pipeline from service and cleaning it.
~
~
~
~
~
~ ~ 2914 Indicate. whether cleaning of any of the ocean intake pipelines will'be attempted during two unit operation or whether cleaning be limited to outages.
4 291.7 Indicate whether all three'ipelines will be used at all times or whether any pipeline will be blocked off.during periods of one unit operation or kept on standby for any reasbn.
291-8 Yerify that construction is s'till-planned for February through December 1982.
Provide a schedule for the construction of the intake and indicate if,
and when nighttime construction is planned..
291. 9
.On page 13 of the Circulating Water, System t1odification document a
discussion of decreased turtle nesting due to initial intake and disch'arge construction is presented.
Provide the magnitude of the decrease in turtle nesting due to recent construction of the second discharge structure.
291 20 Is there any in'tention of using chemical procedures or chemical coatings to control fouling in the new intake?
impact assessment.
If so, give adequate detail for
~ i
-> ~
r g
~
291.11 Indicate the status of other Federal and State permit actions
.related'o the new intake.. Mhere actions are complete, provide copies of the permits oe approvals. along with copies of any-conditions or qualifications.
Provide copies of a11 environmental impact appr a'isals and 'other environ-mental review documents prepared in conjunction with the other permitting actions.
Specifically, provide. copies of the comments of the USFl<S and the NHFS submitted to the Corps of Engineers on their permit.
292. 12.
On an aerial photo such
.as provided on site visit (scale 1" = 200',
taken 12/12/80) show 'the exact location for the third intake pipeline.
including detail for the on-land portion.
Also show the details of the mitigation area to be provided as compensation for the destruction of mangrove swamp.
On the same photo, if appropriate, or on other photo identify boundaries of areas to be used far 'the disposition of dredge spoils resulting from the construction of the third intake pipeline, headwall, and wi'dening of the intake canal.
291 l3 Provide the following information:
a.
The month the mangrove swamp mitigation action is to take place.
b.
The kind of equipment used to. perform the mitigation action (e.g.,
backhoe, dragline).
c.
The names of the specific native species to be planted.
"291.14.
Conduct
- a. survey of the mangrove. swamp to determine whether any 1eather
.ferns are in area to be destroyed.