Forwards Amend 8 to FSAR
ML17212B341
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/26/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML17212B342 List:
References
L-82-28, NUDOCS 8202020395
Download: ML17212B341 (9)


Text

REGULATOR) FORMATION DISTRIBUTION S:M ('R IOS)

'AGCE!SSION NBR:8202020395 DOC ~ DATE: 82/01/26 NOTARI'ZED: YES DOCKET FAGIL,.50 389 'St. ~ Lucie Planti Unj)t 2i Flor ida Power & Light Co+ 05000389

'AUTH ~ NAME AUTHOR AFFILIATION UHRIGiR ~ E ~ . Florida tPower & Li'ght "Co ~

RBC IP ~ NAME RECIPIENT, AFFIL'IATION EISENHUTi0 ~ G ~ D i,v i<<s i on of Li censing

SUBJECT:

.FOrwards Amend 8 )to, FSAR ~ gad <Sub, DISTRIBUTION <<CODE: <<B001S <<COPIES IRECEIYED:LTR, ENCL, SIZE:,:, 9 t'l+~5

~

"TI<<TLE: PSAR/FSAR AMOTS and 'Re a ted <<Cor respondence 1 NOTES ID RECIPIENT <<COPIES L'T. T'R: E NC L 'DRECIPIENT

<<CODE/NAME COPIES LT<<TR ENCI LIC 'BC

'CODEINAM<<E'GTION:

A/D LICENSNG 1 0 BR 03 1 0 LIC BR '03 LA 0 NERSESgY ~ 01 1 1 INTERNAL: ELD 1 ~0 IE 06 "3 3 IE/DEP/EPDB IE/DEP/EPL'B 36 <<3 MPA 1

1 ~

1 0 NRR/DE/CEB li 28 1

'2 1

2 NRR/DE/EQB 13 3 <<3 NRR/DE/GB NRR/DE/HGEB 30  ? '2 NRR/DE/MEB 18 1 1 NRR/DE/M<<TEB 17 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB ?4 1 1 NRR/DE/SEB 25 1 1 NRR/DHFS/HFE B40 1 1 NRR/DHFS/LQB 32 1 NRR/DHFS/OLB 34 ,.

1 1 NRR/DHFS/iPTRB20 1 1 NRR/DS I/AE8 '26 .. 1 1 NRR/DSI/ASB 27 1 1 NRR/DSI/OPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DS I/ETSB 1? 1 1 NRR/OS I/I<<CSB 16 1 1 NRR/DSI/PSB 19 1 NRR/DSI/RAB 22 1 1 "23 1 1 NRR/DST/LGB 33 1 1 REG 'FILE 04 1 1 EXTERNAL: AORS 41 16 16 BNL(AMDTS .ONLY) 1 FEMA REP DIY 39 1 1 LPDR 03 1 NRC <<PDR 02 1 1 NSIC 05 1 NT I-S 1 1

)TOTAL NUMBER OF <<COPIES REQUIRED: L<<T~TR 63 ENCL',58

~ ~

~ 'I s

II

P.o. BOX 529 I 00 MIAMI,F L 33152 FLORIDA POWER & LIGHT COMPANY January 26, 1982 L-82-28 Office of Nuclear Reactor Regulation Attention: Nr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear ter. Eisenhut:

Re: St. Lucie Unit 2 Docket No. 50-389 Amendment 8 To The Final Safet Anal sis Re ort In accordance with the requirements of 10CFR 50.30, Florida Power

& Light Company (FPL) is submitting sixty (60) copies of Amendment 8 to the Final Safety Analysis Report, St. Lucie Plant Unit 2.

The changes to the amendment are contained in the attachment.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems and Technology REU/DME/ah Attachments cc: J.P. O'Rei lly, Director, Region II (w/o attachments)

Harold F. Reis, Esquire (w/o attachments) 8202020395 820126 PDR ADOCK 05000389 K PDR PEOPLE... SERVING PEOPLE

rC.

4 1

N K

h

, J

'U "J

~if

STATE OF FLORXDA )

) ss ~

)

Robert E. Uhri being first, duly sworn, deposes and. says:

That he is Vice President of Florida Power Light Company, the herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Robert E. Uhrig Subscribed and sworn to before me this

",t,','r <,,

day of 19 E~

'NOTARY'PUBLIC, and for the County of Dade,

'.State of Florid No~qfy pugtc, State of Rorids et Lnrgo gy commission expires: My comme".ion &pirm oao>'0. >9

1 t

E F ~

s

ATTACHMENT TO L-82-28 Dated January 26, 1982 Changes in the St, Lucie Plant Unit 2. FSAR as a result of Amendment 8

1) Revised Table 1.7-1 to correct a typographical error.
2) Revised, Appendix 1.9A to correct a typographical error.
3) Revised Subsection 2.5.1.1.1 to remove an erroneous reference.

Change is editorialin nature.

4) Revised Section 3.5 Turbine Missile Analysis, as a result of an NRC request (J Schiffgens).
5) Provide new information in Subsection 3.5.3.1.3.2.
6) Revised Subsection 3.5.3.1.1 to correct a typographical error.
7) Revised Subsection 5.4.2.1.2 to incorporate the response to NRC Question/Response 410.27.
8) Revised Subsection 6.2.2.2.3 to clarify that the trash racks are seismically analyzed to withstand the effects of an SSE and remain functional to the design requirements.
9) Clarified Subsection 6.2.5.2.1. The existing design criteria for the Containment Hydrogen Analyzer Subsystem has not been changed.
10) Revised Table 7.4-2 to remove an editorial note.
11) Revised Subsection 9.1.2 as a result of an NRC request (J Ridgely)
12) Revised Subsection 9.2.7.2 to indicate that flow through the TCW heat exchangers is not monitored downstream by a local flow meter.
13) Revised Subsection 10.4.9 at the request of J Ridgely, NRC reviewer.
14) Revised Subsection 11.2.2.3 to reference the correct figure.

Revision is editorial.

15) Revised Subsection 11.5.2.2 to re-insert information accidently deleted in Amendment 5.
16) Revised Chapter 13 to conform to FPL's current organizational structure.
17) Revised Subsection 15D.11.3 to incorporate information ac-cidently deleted in a previous amendment.
18) Revised Post Docket Questions to refer to the correct references in Section 3.5.
19) Inserted NRC Question 460.20, that was later withdrawn, at the request of the NRC's V Nerses.
20) Revised two 460 Series branch questions to remove typographical errors found in the response.