ML17212B248

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-335/81-29 & 50-389/81-23 on 811116-20.No Noncompliance Noted
ML17212B248
Person / Time
Site: Saint Lucie  
Issue date: 12/03/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17212B249 List:
References
NUDOCS 8112230284
Download: ML17212B248 (4)


See also: IR 05000335/1981029

Text

DEC

C 3

1981

xsaarp4$ 0ÃÃ;

Florida Power and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

'~to

-io

otic

81~

eN

8]gn

Gentlemen:

'~~or

'~'".<rsvp

.,

4fQ@g

~i) \\')$ g

e

0C

r

Subject:

Report Nos.

-335/81-

and 50-389/81-23

~ j f

This refers to the routine safety inspection

conducted

by Mr.

R.

L.

Fie

er of

this office on

November

16-20,

1981,

of activities authorized

by

NRC Operating

License

No.

DPR-67

and

Construction

Permit

. No.

CPPR-144

for

the

St.

Lucie

facility and

to

the

discussion

of our findings

held with Mr. G. J.

Boissy,

Startup Superintendent

at the conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records',

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations or deviations were disclosed.

In accordance

with 10

CFR 2.790(a),

a copy of this letter and the enclosur'e will

be placed in the NRC's'ublic

Document

Room unless

you notify this office,

by

telephone,

within ten

days

of the

date

of this letter

and

submit written

-application to withhold information contained therein within thirty days of the

date of this letter.

Such application

must

be consistent with the requirements

of 2.790(b)(1).

Should you have

any questions

concerning thi s letter,

we will be glad to discuss

them with you.

Sincerely,

Paul J. Kellogg, Chief

Reactor Projects

Branch

2

Division of Resident

and

Reactor Project Inspection

Enclosures

(See

Page 2)

Sii2230284

Sii203'DR

ADOCK 05000335

8

PDR

S

(//

Florida Power & Light Co.

OEC

g 3

f881

Enclosure:

Inspection Report Nos. 50-335/81-29,

50-389/81-23

cc w/encl:

C.

M. Wethy, Plant Manager

N. Weems, Assistant

gA

Construction Manager

B. J. Escue,

Plant Manager

bcc w/encl:

Document Management

Branch

State of Florida

NRC Resident Inspector

RII

RII

RI I+

RFiedler:es

FJape 7g g CNurphy

11/sr /81

11/tire/81

1$/g/81

JOl s

ski

1

/8

RII

RII

KLan is

PKe logg

W/~/81

11/ i /81

iV

CV

~

~

0