ML17212B248
| ML17212B248 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 12/03/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17212B249 | List: |
| References | |
| NUDOCS 8112230284 | |
| Download: ML17212B248 (4) | |
See also: IR 05000335/1981029
Text
C 3
1981
xsaarp4$ 0ÃÃ;
Florida Power and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0.
Box 529100
Miami, FL
33152
'~to
-io
otic
81~
eN
8]gn
Gentlemen:
'~~or
'~'".<rsvp
.,
4fQ@g
~i) \\')$ g
e
0C
r
Subject:
Report Nos.
-335/81-
and 50-389/81-23
~ j f
This refers to the routine safety inspection
conducted
by Mr.
R.
L.
Fie
er of
this office on
November
16-20,
1981,
of activities authorized
by
NRC Operating
License
No.
and
Construction
Permit
. No.
for
the
St.
Lucie
facility and
to
the
discussion
of our findings
held with Mr. G. J.
Boissy,
Startup Superintendent
at the conclusion of the inspection.
Areas
examined
during
the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records',
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no violations or deviations were disclosed.
In accordance
with 10
CFR 2.790(a),
a copy of this letter and the enclosur'e will
be placed in the NRC's'ublic
Document
Room unless
you notify this office,
by
telephone,
within ten
days
of the
date
of this letter
and
submit written
-application to withhold information contained therein within thirty days of the
date of this letter.
Such application
must
be consistent with the requirements
of 2.790(b)(1).
Should you have
any questions
concerning thi s letter,
we will be glad to discuss
them with you.
Sincerely,
Paul J. Kellogg, Chief
Reactor Projects
Branch
2
Division of Resident
and
Reactor Project Inspection
Enclosures
(See
Page 2)
Sii2230284
Sii203'DR
ADOCK 05000335
8
S
(//
Florida Power & Light Co.
OEC
g 3
f881
Enclosure:
Inspection Report Nos. 50-335/81-29,
50-389/81-23
cc w/encl:
C.
M. Wethy, Plant Manager
N. Weems, Assistant
gA
Construction Manager
B. J. Escue,
Plant Manager
bcc w/encl:
Document Management
Branch
State of Florida
NRC Resident Inspector
RII
RII
RI I+
RFiedler:es
FJape 7g g CNurphy
11/sr /81
11/tire/81
1$/g/81
JOl s
ski
1
/8
RII
RII
KLan is
PKe logg
W/~/81
11/ i /81
iV
CV
~
~
0