QEC
0 2
1881
Florida Power and Light Company
ygHitSXQ~g
ATTN:
Dr.
R. E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report Nos. 50-335/81-2
and 50-389/81-20
DEg
USED)
198 Ith
C4~y
",~ faring rm
,~~~9>fi,~,,
I)
~rh /P
lg 1 PH
This refers to the routine safety
inspection
conducted
by Mr. J . J .
Lenahan
of
this office
on October 21-23,
1981,
of activities authorized
by
NRC Operating
License
No.
and
Construction
Permit
No.
CPPR-144
for the
St.
Lucie
facility and to the discussion
of our findings held with Mr. C.
M. Wethy, Plant
Manager, at the conclusion of the inspection.
Areas
examined
during
the
inspection
and
our findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no violations or deviations were disclosed.
We
have
examined
actions
you
have
taken with regard
to previously identified
enforcement matters.
These are discussed
in the enclosed inspection report.
Two new unresolved
items resulted
from this inspection
and are discussed
in the
enclosed report.
These items will be examined during subsequent
inspections.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter and the enclosed
report wi 11
be placed in the
NRC's Public Document
Room.
If the report contains
any information that you believe to be exempt
from dis-
closure under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this office
by telephone
within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days
from the
date of this letter
a written application to this office to withhold such infor-
mation.
If your receipt of this letter
has
been
delayed
such that less
than
seven
days are available for your review, please notify this office promptly so
that
a
new due date
may
be established.
Consistent
with section 2.790(b)(l),
such application
must be accompanied
by an affidavit executed
by the owner of the
information which identifies the document or part thereof sought to be withheld,
and
a full statement
of-the reasons
on the basis of which it is claimed that the
information should
be withheld from public disclosure.
This section
further
requires
the statement
to address
with specificity the considerations
listed in
The information sought to be withheld shall
be incorporated
as far as possible into a separate
part of the affidavit. If we do not hear from
you in this regard within the specified periods
noted above,
the report will be
placed in the Public Document
Room.
~70
i~gtt202mg
81<>
W o5
goQG
P
6',
Sfo(s
~'
4
Florida Power
and Light Company
'GEO
0 2 i98i
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosures:
Inspection Report Nos. 50-335/81-27
and 50-389/81-20
cc w/encl:
C.
M. Wethy, Plant Manager
N. Weems, Assistant
gA
Construction Manager
B. J. Escue,
Plant Manager
bcc w/encl:
NRC Resident Inspector
Document Management
Branch
State of Florida
Paul J. Kellogg, Chief
Reactor Projects
Branch 2
Division of Resident
and
Reactor Project Inspection
RII)JP
JLenahan:ht
IC/~/81
R~II
RIQy
RI~I~y
RII
TCon
on
~CMurphy
J01
ski
KLandis
, HDanEe
1SCp /81
18lQ/81
1
/81
ll
Z'/81
v /81
RI
+I
PKellogg
18/m/81