ML17212A788

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-335/81-19 & 50-389/81-15 on 810807-21.No Noncompliance Noted
ML17212A788
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/02/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17212A789 List:
References
NUDOCS 8109240478
Download: ML17212A788 (3)


See also: IR 05000335/1981019

Text

gfP

2 19S1

~~~ee7i

Florida Power and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report No.

0-335/81-19

d 50-389/81-15

This refers to the routine safety inspection

conducted

by Mr. A. L. Cunningham of

this office on August 7-21,

1981,

of activities authorized

by

NRC License

No.

DPR-67 and Construction Permit No.

CPPR-144 for the St.

Lucie facility and to the

discussion

of our findings

held with Mr. C.

M. Wethy,

Plant

Manager,

at the

conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations or deviations were disclosed.

In accordance

with 10 CFR 2 '90 of the Commission's

regulations,

a copy of this

letter and the enclosed

report will be placed in the

NRC's Public Document

Room.

If the

report

contains

any

information that

you believe

to

be

exempt

from

disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you:

(a) notify this

office

by telephone

within ten

days

from the

date

of this letter of your

intention to file a request for withholding;

and (b) submit within twenty-five

days

from the

date

of this letter

a written application

to this office to

withhold such information. If your receipt of this letter has

been delayed

such

that

less

than

seven

days

are available

for your review,

please

notify this

office promptly

so that

a

new due date

may

be established.

Consistent

with

section

2.790(b)( 1),

such

application

must

be

accompanied

by

an affidavit

executed

by the owner of the information which identifies the

document

or part

thereof sought to be withheld,

and

a full statement

of the reasons

on the basis

of which it is claimed that the

information

should

be withheld

from public

disclosure.

This

section

further

requires

the

statement

to

address

with

specificity the considerations

listed in

10 CFR 2.790(b)(4).

The information

sought to

be withheld shall

be incorporated

as far as possible into a separate

part of the affidavit. If we

do not

hear

from you in this regard within the

specified periods

noted above,

the report will be placed in the Public Document

Room.

~~~/

5

i/(

Oqg4047

OSOO03~>

g gi0902

pgR

@DOCK

~DR

'8

<<(

II

Florida Power" and Light Company

SEP

'2

1981

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosure:

Inspection Report Nos. 50-335/81-19

and 50-389/81-15

cc w/encl:

C.

M. Methy, Plant Manager

N. Meems,

gA Construction Manager

B. J. Escue,

Plant Manager

bcc w/encl:

t

NRC Resident Inspector

Document Management

Branch

State of Florida

Paul J. Kellogg, Chief

Reactor Projects

Branch 2,

Division of Resident

and

Reactor Project Inspection

RII

RII

RII

ALCunningham:ejw

P5MMon gomery

JPS

hr

9/A/81

i 9/g/81

9/W81

KDLandi s

9/0/ /81

RII ~g

PJKellogg

9/~/81