Forwards IE Insp Repts 50-335/81-17 & 50-389/81-13 on 810720-24.No Noncompliance Noted
ML17212A694
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/18/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17212A695 List:
References
NUDOCS 8109090371
Download: ML17212A694 (4)


See also: IR 05000335/1981017

Text

gUQ 48 Is81

~ggg~QOgl

Florida Power

and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

LA

I

Gentlemen:

Subject:

Report Nos.

-335/81-1

and 50-389/81-13

This refers to the routine safety inspection

conducted

by Mr. J.

R. Wray of this

office on July 20-24,

1981,

of activities authorized

by

NRC Operating

License

No. DPR-67 and Construction Permit No.

CPPR-144 for the St.

Lucie facility and to

the

discussion

of our findings

held with Mr. J.

Barrow,

Operations

Superin-

tendent, at the conclusion of the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations or deviations were disclosed.

We

have

examined

actions

you

have

taken with regard to previously identified

enforcement matters

and unresolved

items.

The status of these

items is discussed

in the enclosed report.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter and the enclosed

report will be placed in the NRC's Public Document

Room.

If the report contains

any information that you believe to be exempt from disclo-

sure under

10 CFR 9.5(a)(4), it is necessary

that you:

(a) notify this office by

telephone within ten days

from the date of this letter of your intention to file

a request for withholding; and (b) submit within twenty-five days

from the date

of this letter

a written application to this office to withhold such information.

If your receipt of this letter has

been delayed

such that less

than

seven

days

are available for your review, please notify this office promptly so that

a

new

due date

may be established.

Consistent with section 2.790(b)( 1),

such applica-

tion must be accompanied

by an affidavit executed

by the owner of the information

which identifies the document or part thereof

sought to be withheld,

and

a full

statement

of the reasons

on the basis of which it is claimed that the information

should

be withheld from public disclosure.

This section

further requires

the

statement

to

address

with specificity

the

considerations

listed

in

10 CFR 2.790(b)(4).

The information sought to be withheld shall

be incorporated

as far

as possible

into a separate

part of the affidavit. If we do not hear from you in

this regard within the specified periods

noted above,

the report will be placed

in the Public Document

Room.

Si090'70371

SiOS1S

PDR

ADOCK 05000335

8

PDR

~ r

~

~l

~ 'l

4

WQIL

I

1 p" f

s

/

V

Florida Power and Light Company

8 )s8>

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you

~

I

Sincerely,

Enclosure:

Inspection Report Nos. 50-335/81-17

and 50-389/81-13

cc w/encl:

C.

M. Wethy, Plant Manager

N. Weems, Assistant

gA

Construction Manager

B. J.

Escue,

Plant Manager

bcc w/encl:

NRC Resident Inspector

Document Management

Branch

State of Florida

Paul J. Kellogg, Chief

Reactor Projects

Branch No.

2

Division of Resident

and

Reactor Project Inspection

RII

JRWr ay: ht

8/

/81

RII

CM o

e

8l~y8I

RII

AFGibson

8/+81

Q RIIQ/

HCDance

8

/81

RII

PJe

og

8//P'/81