ML17209B082
| ML17209B082 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/17/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17209B083 | List: |
| References | |
| NUDOCS 8105210154 | |
| Download: ML17209B082 (3) | |
See also: IR 05000335/1981007
Text
l
~S RE0y
P0
Cy
C0O
I
Op
/+i>
+0
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
APR
1 7]98)
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report No.
-
5
This refers to the routine safety
inspection
conducted
by
D.
M. Montgomery of
this office
on
March 23-25,
1981,
of activities authorized
by
NRC Operating
License
NO.
DPR-67 for the
St'.
Lucie facility and to the discussion
of our
fi'ndings held with J.
H. Barrow at the conclusion of the inspection.
Areas
examined. during the
inspection
and
our findings
are
di.scussed
in the
enclosed
inspection
report.
Within these
areas,
the
inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviewsi.with
personnel,
and observations
by the inspector.
The
Region II Mobile Laboratory
was also brought to your site
and used
by the inspector to make certain
i'ndepen-
dent
measurements.
The basic
purpose
of these
independent
measurements
is to
verify your capability for analyzing radioactive effluents,
and to achieve
and
maintain comparable
methods of analyses
between your facility and the
NRC.
The
complete-data
from these
measurements
will be reported in a subsequent
Inspection
Report.
Within the scope of this inspection,
no violations or deviations were disclosed.
One
new unresolved
item resulted
from this inspection
and is discussed
in the
enclosed report.
This item will be-examined during subsequent
inspections.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title
10,
Code of Federal
Regulations,
a copy of this letter and the enclosed
inspec-
.tion report will be placed
in the
NRC's Public
Document
Room. If this report
contains any information that you (or your contractor) believe to be proprietary,
it is necessary
that you make
a written application within 20 days to this office
to withhold such information from public disclosure.
Any such application
must
include
a full statement
of the reasons
on the basis of which it is claimed that
the
information is proprietary,
and
should
be
prepared
so that proprietary
information identified in the application is contained
in a separate
part of the
document.
If we do not hear
from you within the specified period,
the report
will be placed in the Public Document
Room.
Florida Power and. Light Company
APR 17)96)
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
E.c;
R. C..s,
Acting Director
Division of Resident
and
Reactor Project Inspection
Enclosure:
~ Inspection Report No. 50-335/81-07
cc. w/encl:
C.
M. Wethy, Plant Manager
N. Weems, Assistant
Construction Manager