Category:TECHNICAL SPECIFICATIONS
MONTHYEARML17241A3541999-06-0101 June 1999 Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3451999-05-24024 May 1999 Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks ML17229B0711999-03-19019 March 1999 Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron Credit ML17229B0201999-02-23023 February 1999 Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron Dilution ML17229A9551998-12-16016 December 1998 Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9161998-11-25025 November 1998 Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases ML17229A9251998-11-22022 November 1998 Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9131998-11-19019 November 1998 Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML20155C3061998-10-29029 October 1998 Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses ML17229A8441998-08-24024 August 1998 Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation Signal ML17229A7731998-06-15015 June 1998 Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.b ML17229A7601998-06-0303 June 1998 Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank ML17229A7511998-05-27027 May 1998 Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A7481998-05-27027 May 1998 Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7441998-05-27027 May 1998 Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A6501998-03-0303 March 1998 Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative Controls ML17229A5691997-12-31031 December 1997 Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9131997-12-29029 December 1997 Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5491997-12-0101 December 1997 Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion ML17229A4621997-08-22022 August 1997 Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8 ML17229A4341997-08-0101 August 1997 Proposed Tech Specs,Extending semi-annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 & Associated SE ML17229A3601997-05-29029 May 1997 Proposed Tech Specs Incorporating Administrative Changes That Improve Consistency Throughout TSs & Related Bases ML17229A1831996-12-20020 December 1996 Proposed Tech Specs Re Safety Limits & Limiting Safety Sys Settings ML17229A1611996-12-0909 December 1996 Proposed Tech Specs 1.9a Re Core Operating Limits Rept ML17229A1191996-10-31031 October 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML17229A1111996-10-30030 October 1996 Proposed Tech Specs 3/4.9.9 Re Containment Isolation Sys & 3/4.9.10 Re Water level-reactor Vessel ML17229A1091996-10-28028 October 1996 Proposed Tech Specs Rev to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A1061996-10-28028 October 1996 Proposed Tech Specs 1.6 Re Channel Functional test,1.7 Re Containment Vessel integrity,1.8 Re Controlled leakage,1.9 Re Core alteration,3/4.6 Re Containment Systems & 3/4.6.1 Re Containment Vessel ML17228B5641996-07-15015 July 1996 Revised Tech Specs Re Core Alteration Definition ML17228B5041996-06-0101 June 1996 Proposed Tech Specs Re Thermal Margin & RCS Flow Limits ML17228B3761996-01-0404 January 1996 Proposed Tech Specs Rectifying Discrepancy for Each St Lucie Unit & Providing Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes ML17228B3361995-11-22022 November 1995 Proposed TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation,Adapting STS for C-E Plants (NUREG-1432) Spec 3.4.15 ML17228B2451995-08-16016 August 1995 Proposed TS 3.6.6.1, Sbvs. ML17228B2421995-08-16016 August 1995 Proposed Ts,Reflecting Relocation of Selected TS Requirements Re Instrumentation & Emergency & Security Plan Review Process,Per GL 93-07 ML17228B1891995-06-21021 June 1995 Proposed Tech Specs Re Safety Injection Tank Surveillances ML17228B1811995-06-21021 June 1995 Proposed Tech Specs Re Time Allowed to Restore Inoperable LPSI Train to Operable Status ML17228B1791995-06-21021 June 1995 Proposed Tech Specs Re Extended Allowed Outage Time for EDGs ML17228B1471995-05-17017 May 1995 Proposed Tech Specs,Extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation ML17228B1441995-05-17017 May 1995 Proposed Tech Specs Re Administrative & Conforming Update ML17228B0901995-04-0303 April 1995 Proposed Tech Specs Re Incorporation of line-item TS Improvements to TSs 3/4.8.1 & 4.8.1.2.2 for Licenses DPR-67 & NPF-16 ML17228B0591995-02-27027 February 1995 Proposed TS Re Sdcs Min Flow Rate Requirements ML17228B0521995-02-27027 February 1995 Proposed Tech Spec Tables 3.3-3 & 3.3-4 to Accommodate Improved Coincidence Logic & Relay Replacement for 4.16 Kv Loss of Voltage Relays ML17228B0331995-02-22022 February 1995 Proposed TS 4.6.1.3,reflecting Deletion of Refs to Automatic Tester for Containment Personnel Air Lock ML17228A9921995-01-20020 January 1995 Proposed Tech Specs,Relocating Operability Requirements for Incore Detectors to (TS 3/4.3.3.2) to Updated FSAR & Revising Lhr Surveillance 4.2.1.4 & Special Test Exceptions Surveillance 4.10.2.2,4.10.4.2 & 4.10.5.2 ML17228A9031994-11-0202 November 1994 Proposed Tech Specs 3/4.6.2.1 & 3/4.6.2.3,adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants ML17228A8911994-10-27027 October 1994 Proposed Tech Specs,Incorporating Administrative Changes ML17228A6521994-07-28028 July 1994 Proposed Tech Specs Re LTOP Requirements for Power Operated Relief Valves,Per GL 90-06 ML17228A6591994-07-25025 July 1994 Proposed Tech Specs Implementing Enhancements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SR for Testing During Power Operation. ML17228A6561994-07-25025 July 1994 Proposed Tech Specs for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants ML17228A5771994-05-23023 May 1994 Proposed Tech Specs Removing Option That Allows HPCI Pump 1C to Be Used as Alternative to Preferred Pump for Subsystem Operability 1999-06-01
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17309A9961999-06-30030 June 1999 Rev 35 to HP-90, Emergency Equipment. ML17309A9941999-06-17017 June 1999 Rev 1 to COP-06.06, Guidelines for Collecting Post Accident Samples. ML17241A3541999-06-0101 June 1999 Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17309A9951999-05-27027 May 1999 Rev 0 to COP-06.11, Establishing Remote Lab for Analyses of Accident Samples. ML17241A3451999-05-24024 May 1999 Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks ML17229B0711999-03-19019 March 1999 Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron Credit ML17229B0441999-03-0202 March 1999 Cycle 11 Reactor Startup Physics Testing Rept. with 990304 Ltr ML17229B0201999-02-23023 February 1999 Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron Dilution ML17229B0361998-12-22022 December 1998 Rev 20 to Procedure C-200, Odcm. ML17229A9551998-12-16016 December 1998 Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9161998-11-25025 November 1998 Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases ML17229A9251998-11-22022 November 1998 Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9131998-11-19019 November 1998 Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML20155C3061998-10-29029 October 1998 Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses ML20153G0781998-08-26026 August 1998 Rev 19 to Plstqp, Guard Training & Qualification Plan ML17229A8441998-08-24024 August 1998 Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation Signal ML17229A7731998-06-15015 June 1998 Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.b ML17229A7601998-06-0303 June 1998 Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank ML17229A7441998-05-27027 May 1998 Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A7481998-05-27027 May 1998 Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7511998-05-27027 May 1998 Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A6751998-03-27027 March 1998 Cycle 15 Reactor Startup Physics & Replacement SG Testing Rept. W/980402 Ltr ML17229A6501998-03-0303 March 1998 Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative Controls ML17229A6381998-02-12012 February 1998 Rev 19 to C-200, Offsite Dose Calculation Manual. ML17229A6151998-01-12012 January 1998 Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan. ML17229A6141998-01-12012 January 1998 Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1. ML17229A5691997-12-31031 December 1997 Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9131997-12-29029 December 1997 Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5851997-12-12012 December 1997 Rev 0 to ADM-29.01, IST Program for Pumps & Valves. ML17229A5491997-12-0101 December 1997 Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion ML17309A9171997-11-26026 November 1997 Rev 0 to PSL-ENG-SENS-97-068, Spent Fuel Pool Dilution Analysis. ML17229A5931997-09-26026 September 1997 Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures. ML17229A5921997-09-18018 September 1997 Rev 0 to Procedure ADM-17.11, 10CFR500.59 Screening. ML20211Q5841997-09-10010 September 1997 Rev 18 to Training & Qualification Plan ML17229A4621997-08-22022 August 1997 Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8 ML17229A4341997-08-0101 August 1997 Proposed Tech Specs,Extending semi-annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 & Associated SE ML17309A8951997-06-11011 June 1997 Rev 0 to PL-CNSI-97-004, Transportation & Emergency Response Plan for St Lucie Unit 1 SG Project. ML17229A3601997-05-29029 May 1997 Proposed Tech Specs Incorporating Administrative Changes That Improve Consistency Throughout TSs & Related Bases ML17229A2981997-03-0606 March 1997 Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 NPP Using NUREG-0800 Std Review Plan 15.1.5 App A. ML17229A1831996-12-20020 December 1996 Proposed Tech Specs Re Safety Limits & Limiting Safety Sys Settings ML17229A1611996-12-0909 December 1996 Proposed Tech Specs 1.9a Re Core Operating Limits Rept ML17229A1191996-10-31031 October 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML17229A1111996-10-30030 October 1996 Proposed Tech Specs 3/4.9.9 Re Containment Isolation Sys & 3/4.9.10 Re Water level-reactor Vessel ML17229A1061996-10-28028 October 1996 Proposed Tech Specs 1.6 Re Channel Functional test,1.7 Re Containment Vessel integrity,1.8 Re Controlled leakage,1.9 Re Core alteration,3/4.6 Re Containment Systems & 3/4.6.1 Re Containment Vessel ML17229A1091996-10-28028 October 1996 Proposed Tech Specs Rev to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A0951996-10-24024 October 1996 Rev 0 to 00000-OSW-16, In-Situ Pressure Test Results for St Lucie Unit 1 Spring 1996 Outage. ML17229A0861996-10-18018 October 1996 Startup Physics Testing Rept. W/961018 Ltr ML17229A2441996-09-23023 September 1996 Rev 18 to Offsite Dose Calculation Manual (Odcm). ML17228B5641996-07-15015 July 1996 Revised Tech Specs Re Core Alteration Definition ML17229A0961996-06-12012 June 1996 Rev 0 to TR-9419-CSE96-1101, Test Rept - SG Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination. 1999-06-30
[Table view] |
Text
TABLE 3.3-10 FIRE DETECTION INSTRUMENTATION MINIMUM DETECTORS OPERABLE ZONE THERMAL SMOKE LOCATION 2.02.01 3 ZONE-18 REACTOR AUX. BLDG. EL.0.50 4 ZONE-18 HIS I/LPSI/CS PUMP CUBICLES 2.02.02 3 ZONE-28 REACTOR AUX. BLDG. EL.0.50 2.02.03 6 ZONE-38 REACTOR AUX. BLDG. EL.19.50 2.02.04 1 ZONE-HSCP-1 REC. AUX. BLDG. EL.43.00 2.02.05 2 ZONE-58 REACTOR AUX. BLDG. EL.19.50 2.02.06 4 ZONE-68 REACTOR AUX. BLDG. EL. 43.00 2.02.07 5 ZONE-78 REACTOR AUX. BLDG. EL. 43.00 2.02.08 1 ZONE-88 REACTOR AUX. BLDG. EL. 62.00 2.02.09 2 ZONE-98 REACTOR AUX. BLDG. EL. 43.00 2.02.10 2 ZONE-108 REACTOR AUX. BLDG. EL. 43.00 2.02;11 1 ZONE-118 ELECT. PENET. REC. (ANNULUS) 2.02.12 ZONE-128 ELECT. PENET. REC. AUX. BLDG.
EL.19.60 2.02.13 ZONE 13-8 REACTOR TUNNEL BELOW EL. 18.00 2.02.14 ZONE-148 REACTOR EL. 18.00 2.02.15 ZONE-158 REACTOR REACTOR EL. 45.00 ZONE-158 RCP 181 (1 PER PUMP) 2.02.16 ZONE-168 TURBINE BLDG. SWITCHGEAR ROOM 2.02.20 ZONE-208 FUEL HANDLING BLDG. EL.19.50 2.02.21 ZONE-218 FUEL HANDLING BLDG. EL.48.00 2.02.22 ZONE-228 DIESEL GEN. BLDG.
2.01.01 ZONE-1A REACTOR AUX. BLDG. EL.0.50 ZONE-1A HPSI/LPSI/CS PUMP CUBICLES 2.01.02 ZONE-2A REACTOR AUX. BLDG. EL.0.50 2.01.03 ZONE-3A REACTOR.AUX. BLDG. EL.19.50 SxoszzoPK.
ST. LUCIE - UNIT 1 3/4 3-39 5/6/81
TABLE 3.3-10 Cont'd FIRE DfTfCTION INSTRUMENTATION MINIMUM DETfCTORS OPERABLE ZONE THERMAL SMOKE LOCAT IO,N
- 2. 01.04 5 ZONE-4 REACTOR AUX. BLDG. EL. 19.50 2.01.05 5 ZONE-5A REACTOR AUX. BLDG. EL.19.50 2.01.06 5 ZONE-6A REACTOR AUX. BLDG. EL.43.00 2.01.07 4 ZONE-7A REACTOR AUX. BLDG. EL.43.00 2.01.08 4 ZONE-8A REACTOR AUX. BLDG. EL.62.00 2.01.09 2 ZONE-9A REACTOR AUX. BLDG. EL.43.00 2.01.10 2 ZONE-10A REACTOR AUX. BLDG. EL.43.00 2.01.11 1 ZONE-llA ELECT. PENET. REC. (ANNULUSO 2.01.12 -3 ZONE-12A ELECT. PENET. RfC. AUX. BLDG.
EL.19. 60
- 2. 01.13 ZONE-13A REACTOR TUNNEL BELOW fL.18.00 2.01.14 ZONE-14A REACTOR EL.18.00 2.01.15 4 ZONE-15A REACTOR EL.45.00 ZONE-15A RCPS 1A1, 1A2, 182 (1 PER PUMP) 2.01.16 ZONE-16A TURBINE BLDG. SWITCHGEAR ROOM 2.01.20 ZONE-20A FUEL HANDLING BLDG. EL.19.50 2.01.21 ZONE-21A FUEL HANDLING BLDG. fL.48.00 2.01.22 3 ZONE-22A DIESEL GEN. BLDG.
ST. LUG IE - UNIT 1 3/4 3-40 5/6/81
II l't' H
P
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES LIMITING CONDITION FOR TTT 3.7.11.3 The yard fire hydrants and associated hydrant hose houses shown in Table 3.7-4 shall be OPERABLE.
APPLICABILITY: Whenever equipment in the areas protected by the yard fire hydrants is required to be OPERABLE.
ACTION:
a ~ With one or more of the yard fire hydrants or associ ated hydrant hose houses shown in Table 3.7-4 inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> have sufficient additional lengths of 2 1/2 inch diameter hose located in an adjacent OPERABLE hydrant hose house to provide service to the unprotected area(s) if the inoperable fire hydrant or associated hydrant hose house is the primary means of fire suppression; otherwise, provide the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the hydrant or hose house to OPERABLE status within 14 days or, in lieu of any other report r equi red .by Specification 6.9. 1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days outlining the action taken, the cause of the inoperability , and the plans and schedule for restoring the hydrant or hose house to OPERABLE status.
- b. The provisions of Specification 3.0.3 and 3.0.4 are not applicable.
t SURVEILLANCE REQUIREMENTS 4.7.11.3 Each of the yard fire hydrants and associated hydrant hose houses shown in Table 3.7-4 shall be demonstrated OPERABLE:
a 0 At least once per 31 days by visual inspection of the hydrant hose house to assure all required equipment is at the hose house.
- b. At least once per 6 months by visually inspecting each yard fire hydrant and verifying that the hydrant is not damaged.
C. At least once per 12 months by:
- 1. Conducting a hose hydrostatic test at a pressure at least 50 psig greater than the maximum pressure available at any yard fire hydrant.
- 2. Inspecting all the gaskets and replacing any degraded gaskets in the hose couplings.
- 3. Performing a flow check of each hydrant to verify its
'PERABILITY.
ST. LUG IE UNIT,1 3/4 7-45 5/6/81
E l' TABLE 3.7-4 YARD FIRE HYDRANTS AND ASSOCIATED HYDRANT HOSE HOUSES LOCATION* HYDRANT NUMBER East of intake fence enclosure Fire Hydrant ¹10 8 Hose House ¹3 North of Steam Generator Blowdown Building Fire Hydrant ¹4 North of CCW fence enclosure Fire Hydrant ¹5 8 gate, Hose house on east Hose House ¹1 wall of Fuel Handling Building East wall of Diesel Generator Fire Hydrant ¹6 8 Fire House (No number)
- List all Yard Fire Hydrants and Hydrant Hose Houses required to ensure the OPERABILITY of safety related equipment.
ST. LUCIE UNIT 1 3/4 7-46 5/6/81
l,t ~ . lf C 4
~<.. H
!,~8 0'>l l.
lt
(~w>>'-~r<~ ry' 4 h s
, l.,i'.
PLANT SYSTEMS SPRAY AND/OR SPRINKLER SYSTEMS LIMITING COND IT'ION FOR OPERATION 3.7.11.4 The following spray and/or sprinkler system(s) shall be OPERABLE:
- a. Diesel Generator Room Sprinkler System.
APPLICABILITY: Whenever equipument protected>y the spray/sprinkler system is required to be OPERABLE.
ACTION:
With the above required sprinkler system inoperable, establish a hourly fire watch patrol. Restore the system to OPERABLE status within 14 days or, in lieu of any other report required by Specification 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
- b. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVE ILLANCE REQUIREMENTS 4.7.11.2 Each of the above required spray and/or sprinkler systems shall be demonstrated OPERABLE:
- a. At least once per 31 days by verifying that each valve (manual, power operated or automatic) that is not locked, sealed or otherwise secured in position in the flow path is in its correct position.
- b. At least once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of full travel.
- c. At least once per 18 months:
ST. LUG IE UNIT 1 3/4 7-47 5/6/81
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS Continued
- 1. By performing a system functional test which includes simulated automatic actuation of the system, and:
a) Verifying that the automatic valves in the flow path actuate to thei r correct positions on a test signal, supplied from a thermal detector, and b) Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.
- 2. By a visual inspection of the dry pipe spray and sprinkler headers to verify their integrity, and
- 3. By a visual inspection of each nozzle's spray area to verify the spray pattern is not obstructed.
ST LUG IE UNIT 1, 3/4 7-48 5/6/81
0 ~ I A
~,
I II I
ll l1 < L
~ r ~
PLANT SYSTEMS 3/4.7.12 PENETRATION FIRE BARRIERS LIMITING CONDITION FOR OPERATION 3.7.12 All electrical penetration fire barriers protecting safety related areas shall be intact.
APPLICABILITY: At all times.
ACTION:
- a. With one or more of the above requi red electrical penetration fire barriers not intact and with the area of the affected barrier(s) monitored by OPERABLE (pursuant to Specification 3.3.3.7) fire detection instrumentation, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect at least one side of the affected penetration at least once per hour.
- b. With one or more of the above required electrical penetration'ire barriers not intact and with the area of the affected barrier(s) not monitored by OPERABLE (pursuant to Specification 3.3.3.7) fire detection instrumentation, establish a continuous fire watch on at least one side of the affected penetration within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
- c. The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REQU IR EME NTS 4.7.12 The above required electrical penetration fire barr iers shall be verified to be intact:
- a. At least once per 18 months by a visual inspection.
- b. Prior to returning a penetration fire barrier to intact status following repairs or maintenance by performance of a visual inspection of the affected electrical penetration fire barrier(s).
ST. LUG IE UNIT 1 3/4 7-49 5/6/81
~ /
J II J If 11 I
PLANT SYSTEMS BASES The inspection frequency applicable to snubbers containing seals fabricated from materials which have been demonstrated compatible with their operating environment (only ethylene proplyene compounds to date) is based upon maintaining a constant level of snubber protection. Therefore, the required inspection interval varies inversely with the observed snubber failures. The number of inoperable snubbers found during'an inspection of these snubbers determines the time interval for the next required inspection of these snubbers. Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection. However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25$ ) may not be used to lengthen the required inspection interval. Any inspection whose results require a shorter inspection interval will override the previous schedule.
To provide further assurance of snubber reliability, a representative sample of the installed snubbers will be functionally tested during plant shutdowns at 18 month intervals. These tests will include stroking of the snubbers to verify proper piston movement, lock-up and bleed. Observed failures of these sample snubbers will require functional testing of additional units. To minimize personnel exposures, snubbers installed in high radiation zones or in especi ally difficult to remove locations (as identified in Table 3.7-2) may be exempted from these functional testing requirements provided the OPERABILITY of these snubbers was demonstrated during functional testing at either the completion of their fabrication or at a subsequent date.
3/4. 7.11 FIRE SUPPRESSION SYSTEMS The operability of the fire suppression systems ensures that adequate fires suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppresion system consists of the water system, fire hose stations, yard fire hydrants, hydrant hose houses, and spray and/or sprinkler systems. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
In the event that portions of the fire suppr ession systems are inoperable, alternate backup fire fighting equipment is requi red to be made available in the affected areas until the inoperable equipment is restored to service.
ST. LUCIE - UNIT 1 B 3/4 7-6 5/6/81
~ ~