ML17209A819

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info Re Util 800804 Updated Response to IE Bulletin 80-06, Engineered Safety Feature (ESF) Reset Controls. Util Must Provide Description Re Mods Planned for Charging Pumps,Installation Date & Test
ML17209A819
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/06/1981
From: Clark R
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
IEB-80-06, IEB-80-6, NUDOCS 8103160878
Download: ML17209A819 (6)


Text

MAR 06 ls81 Docket No. 50-335 Dr. Robert E. Uhrig Vice President Advanced Systems

& Technology Florida Power

& Light Company P. 0, Box 529100 Miami, Florida 33152

Dear Dr. Vhrig:

c et F

DISTRI TION:

NRC PDR L PDR NSIC TERA ORB¹3 Rdg DEisenhut RPur pie TNovak RTedesco GLainas OE 1(}

I&E (3)

OELD RClark CNelson PKreutzer (3)

ACRS (16)

JHeltemes Gray File Ife have reviewed your August 4, 1980 updated response ot IE Bullentin 80-06 and have determined that the additional information requested in the enclosure is necessary to continue our review for "

St. Lucie Unit.l.

You are requested to provide this information within 60 days of receipt of this letter.

Sincerely, Qrigjnaf sjl-.nod Robe.g A. Cfzrk Robert A. Clark, Chief Oper ating Reactors Branch 83=

Divison of Licensing

Enclosure:

As stated cc:

See next page 8103 18($ FR,

+C.05: Q5Z F-Rema

~) ~/SI oFFIcEIl SURNAME(

OAVES ORB¹3:

L P

u zer 3('~$ 8 I ORB¹3:DL C

/pn 3 ~81

~ 0 ~ OV

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

ORB¹':D R

rk

~

~

~ ~ ~ ~ ~ ~ ~ ~

~

a/g /81 NRC FORM 318 IIO/80) NRCM 0240 OFFICIAL RECORD COPY

/."

II

~

e

~.

~ ~

P

'aC... ~

l,'

f

~R AEOII P

+4 i

0

+a*a+

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 6, 1981 Docket No. 50-335 Dr, Robert E. Uhrig Vice President Advanced Systems L Technology Florida Power Im L'ight Company P. 0. Box'529100 Miami, Florida 33152

Dear Dr. Uhrig:

,lle have reviewed your August 4, 1980 updated response to IE Bullentin 80-06 and have determined that the additional information requested in the enclosure is necessary to contihue our review for S't. Lucie Unit 1.'ou are requested to provide this information within 60 days of receipt of this letter.

~incerely,

Enclosure:

As stated cc:

See next page Robert A. Clark, Chief Operating Reactors Branch P3 Divison of Licensing

Florida Power

& Light Company CC:

Robert Lowenstein, Esquire Lowenstein,

Newman, Reis

& Alexrad 1025 Connecticut

Avenue, N.W.

Washington, D.. C.

20036 Norman A. Coll, Esquire McCarthy, Steel, Hector

& Davis 14th Floor, First National Bank Building Miami Florida 33131 Indian River'unior College Library 3209 Virginia Avenue Fort Pierce, Florida 33450 Admi ni strator Department of Environmental Regulation Power Plant Siting Section State of F1ori da 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Jack Schreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector/St.

Lucie Nuclear Power Station c/o U.S.N.R.C.

P. 0.

Box 400 Jensen Beach, Florida 33457 Bureau of Intergovernmental Relations 660 Apalachee Parkway Tallahassee, Florida 32304 Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)

U.S. Environmental Protection Agency Washington, D.

C.

20460 U.S. Environmental Protection Agency Region IV Office ATTN:

E I S COORDINATOR 345 Court 1 and St rect, N. E.

Atlanta, Georgia 30308 Mr. Charles B. Brinkman Manager - Washington Nuclear Operations C-E Power Systems Combustion Engineering, Inc.

4853 Cordell'Avenue, Suite A-1

Bethesda, Maryland 20014

ENCLOSURE ESF Reset Controls 1.

Please provide a narrative description of the modifications planned for the charging pumps.

Provide anticipated installat.ion date and a

comi~itment to test after installation.

2.

'Rhen is next St.

Lucie Unit 1 refueling outagel 3.

Please provide further clarification and justification for not modifying-the folio>ring safety-related devices.

These do.not remain in their emergency mode upon reset of the ESF actuation signal:

1.

SI tank check valve leakoff valves 2.

Oiesel Generator lockout relays 3.

F'vlP lA discharge valves 4.

Boric Acid make-up pumps 5.

Boric Acid Tank Recirculation line valves 6.

Boric Acid Control Isolation Valve 7.

VCT discharge valve 8.

RCP oil lift pumps

0 e

~ ~

S