ML17209A574

From kanterella
Jump to navigation Jump to search
Application for Amend to License DPR-67 Revising Tech Specs to Reflect New UHS Flow Barrier Configuration
ML17209A574
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/08/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17209A575 List:
References
L-81-8, NUDOCS 8101270694
Download: ML17209A574 (3)


Text

r'f REGULATORY NFORMATION DISTRIBUTION'Y EM (RIDS)

ACCESSION" NBRs8lp1270694 DOC DATEs 81/01/08 NOTARIZEDsI YES DOCKET FACIL:50 335 St; Lucie p)antE, Unit" AUTH's N)Mg"

~

AUTHOR AFFILIATION ii Florid~ Powe'r 8 Light Cos 05000335 UHRIGiR ~ E ~ F 1 or -i da Power 8 Light'o,'EC IP ~ NAMEl REC IPIENT AFFILIATION,,

f icei of Nuclear Reactor I Regulation~ Dir'ector"

SUBJECT:

- Application for"amend. to icense; PPR 67 r eyising Tech'- Spe'cs" I

to. r ef1 ect" newUHS, fl oy bar rierI configuration.".Tech Specs 8 safety evaluation- encl; DISTRISUTION CODE; AOOISr COPIES RECEIYEDiLTR, ENCL SIZE:

TZTLEs Gener a'I Distribution for~ aftei Issuance'f Operating License

~

NOTES

'4'OPIES RECIPIENT'D.COD)/NAMEI LTTR ENCL'3 RECIPIENT" ID CODE/NAME r,COPIES LTTR ENCL.

ACTION CLARK I R's 13 INTERNAI.: D/D IR'r HUM, FAC08 I LEI OEL 06'1 2'2 1

1 0 1 DIPL DI.Vr OF; LIC NRC'DR ASSESS

. 02'R BR 10 1

1 1

1 0

01 1 1 NSIC'9 EXTERNAL! ACRSr 05i 16" 1.

16 1

I.P DR" 030 1 1 JAN 28 J98)

TOTAL~ NUMBER'F COPIES REQUIRED S I TTR 39 rENCLI "

37

0, 0 4 i( l 4

ll l

lv,

,( 1 fl 1 j1 )

ls 1

r> % r M N P

l

~ 1 I f

cree I-<n CD V ~ ~

<<'3 FLORIDA POWER & LIGHT COMPANY I+

LQ January 8, 1981 Director'f Nuclear Reactor Regulation L-81-8 Attention: Mr. D. G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.G. 20555

Dear Mr. Eisenhut:

Re: St. Lucie Unit 1 Docket No. 50-335 Proposed Amendment to Facilit 0 erati n License DPR-67 In accordance with 10 CFR 50.30, Florida Power 8 Light Company submits herewith three (3) signed originals and forty (40) copies of a request to amend Appendix A of Facility Operating License DPR-67. This proposal supersedes the Ultimate Heat Sink Section of our proposal of November 16, 1978 (L-78-365).

The proposed amendment is described below and shown on the accompanying Technical Specification page bearing the date of this letter in the lower right hand corner.

Pa e 3/4 7-18 The installation of gates/valves to control water flow through the Ultimate Heat Sink (UHS) barrier dam was completed on July 31, 1977. The Limiting Conditions for Operation, Action Statement, and Surveillance Requirements of Specification 3/4 7. 5 are revised to reflect the new UHS flow barrier configuration.

The proposed amendment has been reviewed by the St. Lucie Plant Facility Review Group and the Florida Power 8 Light Company Nuclear Review Board. They have concluded that it does not involve an unreviewed safety question. A safety evaluation is attached.

Very truly yours, Robert E. Uhrig Vice President (ooj REU/MAS/ras S Attachment 3 3 cc: Mr. J. P. O'Reilly, Region II Harold Reis, Esquire 8 y pypvp694 PEOPLE... SERVING PEOPLE