Forwards Monthly Status Rept of Const/Startup Progress for Dec 1980
ML17209A568
Person / Time
Site: Saint Lucie 
Issue date: 01/14/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-81-17, NUDOCS 8101220172
Download: ML17209A568 (4)


Text

REGULATORY DEFORMATION DISTRIBUTION SYS EM (RIDS)

ACCESSION NBR:8101220172:

DOC ~ DATE: 81/01/14 NOTARI D:

NO DOCKET FACIL;50 389 St, Lucie Plantg Un.it

?g Florida Power 8 Light Coe 05000389 AUTH B NAME AUTHOR AFFILIATION UHRIGER ~ E-,

Flor ida Power 8 Light Co.

RKCIP ~ NAh1E" RECIPIENT AFFILIATION EISENHUT~D ~ G ~

Division of Licensing

SUBJECT:

- Forwards monthly status rept-of const/startup pragress for Dec 19800 DISTRIBUTION CODE, BOO IS COPIES RECEIVED:LTR $'NCL Q SIZE::.

TITLE:: PSAR/FSAR AMDTS and Related Correspondence NOTES:'ECIPIENT'D CODE/NAME ACTION:"

A/D LICENSNG RUSHBROOK<M.

INTERNAL: ACCID EVAL BR26 CHEM ENG BR 08 CORE PERF BR 10 EMERG PREP 22 GEOSCIENCE S

14 HYD/GEO BR 15-I t>>'E>>

06 LIC QUAL BR MECH ENG BR 18 NRC PDR 02 OP LIC BR PROC/TST REV 20 R

BR22' F

01 ENG BR?5 COPIES'TTR ENCL 1

0 0

1 1

1 1

1 1

1 0

1 1

2 2

3 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME YOUNGBLOODEB BIRKELE R, 04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR ILC SYS BR 16 LIC GUID BR MATL>> ENG BR 17 MPA OKLD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAL BR 24 SYS INTERAC BR COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

3 3

1 1

1 1

1 1

1 1

1 0

1 0

1 1

1 1

1 1

1 1

1 1

EXTERNAL: ACRS NSIC 27 05 16 16 1

1 LPDR 03 1

1 JN 28 'l98k, TOTAL NUMBER OF COPIES REQUIRED:

LTTR 57 ENCL 51

1$

I li'

~

rl tl 0

LS CI J

CD Ivi~

P.O. BOX 529100, MIAMI,FL 33152 y9ljb~

. - iver>>'~i FLORIDA POWER IL LIGHTCOMPANY January 14, 1981 L-81-17 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Eisenhut:

Re:

St. Lucie Unit 2 Docket No. 50-389 Construction Pro ress U date Attached is a report of the construction/startup progress for St. Lucie Unit 2 for December, 1980. If you have any questions regarding the attached information, or would like additional information from FPL, please feel free to call me.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/TCG/ah Attachment cc:

William H. Lovelace, Office of Management 8 Program Analysis U.

S. Nuclear Regulatory Commission J.

P. O'Reilly, Director, Region II Harold F. Reis, Esquire goo I 93 PEOPLE... SERVING PEOPLE

FLORIDA POWER 6 LIGHT ST, LUCIE UNIT 2 CONSTRUCTION/STARTUP MONTHLY STATUS REPORT r

CURRENT PERIOD:

December, 1980 SCHEDULE STATUS:

Overall Project Construction/Start Up Critical Path Variance Target Fuel Load Date 68 59.2

  • 0.0 weeks 10/29/82 MAJOR WORK HIGHLIGHTS:

HCHEDULE ACTUAL 1-Erect HVAC exhaust stack on RCB exterior shield wall,.

2-Start set forms for RCB ext. shld. wall dome.

3-Set safety injection tank 2B2.

I 4-Concrete for refueling water storage tank 5-Set RC pump volute 2B2 6-Completed switchgear.room DC battery installation 7.

Complete RC loop large bore piping 8-Mobilize Pittsburgh-Desmoines Steel Co.-Erect.

Water Stg.

12/20/80 12/1/80 02/11/81 01/15/81 12/OX/80 11/15/80 03/14/81 tnk.02/09/81 12/31/80 12/9/80 12/23/80 12/12/80 12/22/80 12/15/80 BULK QUANTITY STATUS:

TOTAL TO DATE CURRENT MONTH QUANTITY AVERAGE MONTHLY INSTAL. RATE (QTY./MO.)

104 90$

Concrete (cy)

Large Bore Pipe (ft)

Small Bore Pipe (ft)

Large Bore Hangers (ea)

Whipping Restraints (tn)

Cable Tray (ft)

Exposed and Embedded Cond@it Power Cable (ft)

Control Cable (ft)

Terminations (ea)

UANTITY 119, 817 54,148 54,913 2,111 128 30,034 (ft~

294,947 190,564 480,763 7,528 PHYSICAL PERCENT N'4.4 65.1 27.9 45.0 41.6 76.2 72.6 28.7 18.1 13.5 1,444 2,586

',137 112 40 514 7,505 23,103 162,661 2I 137 2,930 2,080 6820 110 25

$005 9/30 39355 164265 FORECASTED 2,720 1,920 7,259 130 25 1,210 8,470 26,740 125,920 4,875 START UP PROGRAM STATUS:

Preoperational Test Procedures System Turnovers(Preliminary)

Preoperational Tests SCHEDULED TO DATE 83 1

COMPLETED TO DATE 117 23 2

CURRENT MONTH 6

6 0

TOTAL

~az uxase 193 152 193

  • Reforecast of additional scope of work offset a 2.2 percent gain in physical accomplishment in December.