ML17209A471
| ML17209A471 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 10/24/1980 |
| From: | Ahearne J NRC COMMISSION (OCM) |
| To: | NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| Shared Package | |
| ML17209A468 | List: |
| References | |
| REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR NUDOCS 8012230037 | |
| Download: ML17209A471 (1) | |
Text
'
+LT hfdf+
4
~P0
~fL' Q) o o+
~
W Pg C
iJtwlTFD S i ATES
~
NUCLEAR REGULATORY CONiVi!K-QN Vi'ASMINGTOM b. C. 20555 October 2-';, 1980 CHA1RMAN MBOPJNDUH FOP FROM:
SUBJECT:
\\
Execu=ive Die c".o for Opere.ions John Aheerne STATiON BLAC UT i have. several follow-up ou s.ions re"arding the September 26 eport on the status of 1ask Action Plan A-4-':
(TAP A-44) station
'blackou..
Section 3 af TAP A-44 relied on a prelimrinary s.ai, study which did not idenLi y any operating plant as liaving an "unusually high susceptibility"
.o severe core damaoe irom a s Lation blackout.
This criiterion is no defined.
Please identify the plants for which the probability of s a Ion blackout is comparable o or exceeds the value
=or St: Lucie Ho. 2.
For these plants is here any basis for not now requiring the changes already made at.h two S..
Luci'e Units, including ihe implementa ion oi training programs and procedures ior Station
~
operation during a blackout and =or restora.ion of ac power?
Please provide a response wi h.he repcr referenced in he Septem-ber 26 response.
cc:
~ornissioner Gilinsky Commissioner Hendrie Commissioner Bradford OGC
. OPE