ML17209A227

From kanterella
Jump to navigation Jump to search
Forwards LER 80-051/03L-0
Date released: 01/25/2018 Download: ML17209A227


LER 80-051/03L-0:on 800904,during Return to Full Power Operation,Control Element Assembly 33 Dropped to Full Insertion.Caused by Blown Fuse in Alternate Parallel Supply Line.Fuse Replaced & Power Supplies Exchanged
ML17266A280
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/03/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A280 (2)
Forwards LER 80-051/03L-0
ML17209A225
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/03/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17209A225 (1)