ML17208A955

From kanterella
Jump to navigation Jump to search
Forwards LER 80-033/03L-0
Date released: 01/25/2018 Download: ML17208A955


LER 80-033/03L-0:on 800724,while at 100% Power,Control Element Assembly 63 Dropped to Fully Inserted Position. Caused by Technician Accidently Shorting Output of 15-volt Power Supply While Taking Routine Voltage Measurements
ML17266A252
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/25/1980
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A252 (1)
Forwards LER 80-033/03L-0
ML17208A954
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/25/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17208A954 (2)