Forwards IE Insp Rept 50-335/80-01 on 800225-26 & 0310-13. No Noncompliance Noted
ML17208A633
Person / Time
Site: Saint Lucie 
Issue date: 04/07/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17208A634 List:
References
NUDOCS 8005220374
Download: ML17208A633 (2)


See also: IR 05000335/1980001

Text

f

mf ~. ~A ~

XL

I'((

~tt AEONS

In Reply Refer To:

RII:DMM

50-335/80-1

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

APR

7 1980

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

Gentlemen:

This refers to the inspection conducted

by D. M. Montgomery of this office on

February

25 through March 13,

1980 of activities authorized by NRC License No.

DPR-67 for the St. Lucie facility, and to the discussion of our findings held

with J. H. Barrow at the conclusion of the inspection.

Areas examined during the inspection

and our findings are discussed

in the

enclosed inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

The Region lI Mobile Laboratory was also brought to your site and used by the

inspector to make certain independent

measurements.

The basic purpose of these

independent

measurements

is to verify your capability for analyzing radioactive

effluents

and to achieve

and maintain comparable

methods of analyses

between

your facility an'd the NRC.

The complete data from these

measurements will be

reported in a subsequent

Inspection Report.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the. enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within~ 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document. If we do not hear from you in this regard within

the specified period, the report willbe placed in, the Public Document

Room.

8005280 $ /f

APR

7 ~ggp

Florida Power and Light Company

Should you"have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

J. Philip S ohr, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report No. 50-335/80-1

cc w/encl:

C.

M. Wethy, Plant Manager

P. 0. Box 128

, Ft. Pierce,

FL

33450

Nat Weems, Assistant

QA Manager

P. 0. Box 128

~

~

~

Ft. Pierce,

FL

33450