ONS-2017-056, Oconee, Units 1, 2 and 3 - Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-004

From kanterella
(Redirected from ML17208A063)
Jump to navigation Jump to search
Oconee, Units 1, 2 and 3 - Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-004
ML17208A063
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/20/2017
From: Ray T D
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17208A054 List:
References
ONS-2017-056
Download: ML17208A063 (2)


Text

ENERGY ONS-2017-056 10 CFR 50.54(q) July 20, 2017 Attn: Document Control Desk U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-27 46

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 Emergency Plan Implementing Procequres Manual Volume 1, Revision 2017-004 Thomas D. Ray Vice President Oconee Nuclear Station Duke Energy ON01VP 17800 Rochester Hwy Seneca, SC 29672 o: 864.873.5016 f 864.873.4208 Tom.Ray@duke-energy.com ,f-; Please find attached for your use and review a copy of the revision to the Oconee Nuclear Station Emergency Plan Implementing Procedures.

This revision is being submitted in accordance with 10 CFR 50.54(q) and does not reduce the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.

If there are any questions or concerns pertaining to this revision please call Mc;ic Mcintyre, Emergency Preparedness Manager, at 864-873-3389.

By copy of this letter, two copies of this revision are being provided to the NRC, Region II, Atlanta, Georgia. Sincerely, Vice President Oconee Nuclear Station Attachments:

Coversheet-EPIP Volume 1 -Revision 2017-004 Instruction page EPIP Procedures RP/O/A/1000/003 A Rev 003 50.54(q) Evaluation Screening Evaluation Form 50.54(q) Effectiveness Evaluation Form

  • . ONS-2017-056 U.S. Nuclear Regulatory Commission July 20, 2017 xc: w/2 copies of attachments Ms. Catherine Haney Administrator, Region II Marquis One Tower 245 Peachtree Center., NE Suite 1200 Atlanta GA 30303-1257 w/copy of attachments Ms. Audrey Klett, Project Manager (ONS) (by electronic mail only) , U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8G9A Rockville, MD 20852-2738 w/o attachments Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station ELL-EC2ZF