ML17208A033
| ML17208A033 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/04/2015 |
| From: | Fasano C AREVA |
| To: | Victor Hall NRC/NRO/DCIP/CIPB |
| Sebrosky J, NRR/JLD, 415-1132 | |
| References | |
| AREVA-15-02765 | |
| Download: ML17208A033 (2) | |
Text
AREVA-15-02765 September 4, 2015 Victor Hall Senior Project Manager Mail Stop O-13H16 U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Rockville, MD 20852
Subject:
Flood Hazard Re-Evaluation for Waterford Steam Electric Station
Dear Mr. Hall:
Enclosed please find four (4) computer hard drives containing the following documents and associated appendices (including input/output files) supporting the Flood Hazard Re-Evaluation project for Waterford Steam Electric Station:
File Name Title Associated Files 32-9226993-000.pdf Waterford Steam Electric Station Flooding Hazard Re-Evaluation -
Local Intense Precipitation Electronic Appendices FLO-2D Input/Output Files 32-9226996-000.pdf Waterford Steam Electric Station Flooding Hazard Re-Evaluation -
Probable Maximum Flood Electronic Appendices Electronic References HEC-RAS Input/Output Files 32-9226999-000.pdf Waterford Steam Electric Station Flooding Hazard Re-Evaluation -
Dam Failure Electronic Appendices Electronic References HEC-RAS Input/Output Files 32-9227002-000.pdf Waterford Steam Electric Station Flooding Hazard Re-Evaluation -
Probable Maximum Hurricane Electronic Appendices Electronic References 32-9227005-000.pdf Waterford Steam Electric Station Flooding Hazard Re-Evaluation -
Probable Maximum Storm Surge Electronic Appendices Electronic References ADCIRC Input/Output Files SLOSH Input/Output Files 32-9227011-000.pdf Waterford Steam Electric Station Flooding Hazard Re-Evaluation -
Ice Induced Flooding Electronic Appendices Electronic References 32-9227036-000.pdf Waterford Steam Electric Station Flooding Hazard Re-Evaluation -
Combined Effects Electronic Appendices Electronic References ADCIRC+SWAN Input/Output Files FLO-2D Input/Output Files HEC-RAS Input/Output Files 32-9231496-000.pdf Waterford Steam Electric Station Flooding Hazard Re-Evaluation -
Nuclear Power Island Structure Local Intense Precipitation Electronic Appendices Electronic References CulvertMaster Input/Output Files AREVA INC Solomon Pond Park, 400 Donald Lynch Boulevard, Marlborough, MA 01752 Tel.: 508 573 6500 Fax: 508 573 6614 www.areva.com