ML17207A862
| ML17207A862 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/21/1980 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17207A863 | List: |
| References | |
| NUDOCS 8003060467 | |
| Download: ML17207A862 (3) | |
See also: IR 05000389/1979018
Text
~S RKQ0
1$
~o
+rp
gO
++*++
In Reply Refer To:
RIX:JG
50-389/ 9-1
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
FEB 21 1980
~-sp'lorida
Power and Light Company
Attn:
R. E. Uhrig, Vice President
Advanced
Systems
and Technology
Post Office Box 529100
Miami, FL
33152
Gentlemen:
Thank you for your letters of November 21,
1979,
and December
20,
1979, informing
us of the steps
you have taken to correct the items of noncompliance
concerning
activities under
NRC Construction Permit No.
CPPR-144 brought to your attention
in our letter of November 5,
1979.
In your November
21 letter you requested
reconsideration
of the noncompliance
dealing with failure to follow procedures
in purchase of safety-related
Service
Level I protective coating materials
(Part
A of Appendix A to letter RII:JJL
50-389/79-18).
This request
was based
on discovery of documentation after com-
pletion of the inspection which indicates that the protective coating materials
were purchased
as safety-related
as required by Procedure
ASP-8.
This noncompliance
was discussed
at length by the inspector with site personnel
during the inspection.
The inspector
emphasized
that his main concern
was the ongoing application of
protective coating materials inside the containment building which apparently
had
not been inspected
when they were received
on site to insure that the materials
met specification requirements.
Except for the assignment
of a lay number to the
receiving inspection
(NRR) report, there
was no documentation
to verify that
materials
were inspected
when they were received
to assure
compliance with speci-
fication requirements.
Though it appears
you have complied with the requirements
of Procedure
ASP-8,
you did not meet the requirements
of Procedure
QI7.1, "Instruc-
tion for Receiving Inspection of Seismic or Safety-Related
Material".
Therefore,
the
noncompliance will stand.
In addition,
as discussed
in the telephone
discussion
held between
E.
Sherman of
your staff and J.
Lenahan of this office on February
14,
1980, it is our under-
standing that you will provide a supplemental
response
to this office by March
0,
1980, clarifying statements
made in Part
B of the attachment
to your November
letter.
Sincerely,
James
P. O'Reilly
Director
cc:
(see
page
2)
8008060
+6'
Florida Power and Light Company
FEB Rl 1980
cc:
C.
M. Wethy, Plant Manager
Post Office Box 128
Ft. Pierce,
FL
33450
Nat Weems, Assistant
QA Manager
Post Office Box 128
Ft. Pierce,
FL
33450