ML17207A849

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 80-03, Main Turbine Electrohydraulic Control Sys. No Specific Action or Response Required
ML17207A849
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 01/31/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
IEIN-80-03, IEIN-80-3, NUDOCS 8002270063
Download: ML17207A849 (2)


Text

~S RE00

~4

~o Op A.no qO

+a*++

In Reply Refer To:

RII:JPO

-335,.50-389 50-250, 5 - 51 Cw UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 JAN 31 1980 Florida Power a'nd Light Company Attn:

R.

E. Uhrig, Vice President Advanced Systems and Technology P. 0. Box 529100 Miami, Florida 33152 Gentlemen:

This Information Notice is provided as an early notification of a possible significant matter. It is expected that recipients will review the information for possible applicability to their facilities.

No specific action or response is requested at this time. If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding this matter, please contact.the Director of the appropriate NRC Regional Office.

Sincerely, James P.

Director e.'ly

Enclosures:

1.

IE Information Notice No. 80-03 2.

List of IE Information Notices Recently Issued

Florida Power and Light Company cc w/encl:

C. M. Wethy, Plant Manager Post Office Box 128 Ft. Pierce, Florida 33450 Nat Weems, Assistant gA Manager Post Office Box 128 Ft. Pierce, Florida 33450 H. E. Yaeger, Plant Manager Post Office Box 013100 Miami, Florida 33101