ML17207A815
| ML17207A815 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Saint Lucie |
| Issue date: | 12/19/1979 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8002130292 | |
| Download: ML17207A815 (6) | |
Text
J. Boeglk Docket Hos. 50-250 50-251 and 50-335 Sincerely, Original SIgned By A. Schvrencer, Chief Operating Reactors Branch Ol Division of Operating Reactors cc:
See next page Iiiew>>IIV mr I:IIt<
Q$ QEPBER DISTRIBUTION 5222 511-2511/251/332 NRC PDRs (3) cvocal PDRs (2)
TERA NSIC
. D. Eisenhut.
R. Tedesco M. Gamill B. Grimes A; Schwencer R. Reid Dr. Robert E. Uhrig, Vice President R. Erickson Advanced Systems and Technology tt. Grotenhuis Florida Power and Light Company.
Post Office Box 629100 C. Parrish Hiami, Florida 331 52 IKE {3)
- Attorney, OELD (2)
Dear Dr. Uhrig:
P. Magner M. C. Burke Your lhvember 6, 1979 letter replied to our September 17, 1979 letter regarding implementation of 40 CFR Part 190, EPA Uranium Fuel Cycle Standard for the Turkey Point P'lant Unit Nos.
3 and 4, and the St. t.ucie Plant, Unit Ho. 1.
In four 'letter you provided an interim commitment for demonstrating compliance to 40 CFR Part 190.
This latter is to inform you that the report required by Technical Specification 3.9.1.a or 3.9.2.a, Appendix A, for Turkey Poin't and Technical Specifications 2.4.l.h and 2.4.3.e, Appendix B, for St. Lucie-should include a dose assessment with respect to conformance with 40 CFR Part 190, or Mhatever a variance to 40 CFR Part 190 is pro/ected.
~SEE PREVIOBS YELL01< FOR CONCURREHCE
$ooz.9o z-9 >
OFFICE P'URNAME DQR;ORBl~
-- DOR:ORBI:""
HGrotenhuis" ASchwencer""
12/14/79" ""12/ "/79.-""
~ DOR:ORB4*
"PEricksm'12 14 79.
DATE I/I'RC FORM 318 (9.78) NRCM 0240 4U.S. GOVERNMENT PRINTING OFFICE: 19l9 28'9 389
I
~
- I
)~g <
IN f
f F
4I I
p%
1 J,
1 4
r 1
V 4
lt V
)l y
'l
~y,g AEGjg~
+0 0
Op C
0 $
4~*~4 Docket Nos. 50-250
.50-251 and 50-335 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, Q. C. 20555 December 19, 1979 0
Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100
'Iliami, Florida 33152
Dear Dr. Uhrig:
Your November 6,
1979 letter replied to our September 17, 1979 letter regarding implementation of 40 CFR Part 190, EPA Uranium Fuel Cycle Standard for the Turkey Point Plant Unit Nos.
3 and 4, and the St.
Lucie Plant, Unit No. l.
In your letter you provided an interim commitnent for demonstrating compliance to 40 CFR Part 190.
This letter is to inform you that the report required by Technical Specification 3.9.l.a or 3.9.2.a, Appendix A, for Turkey Point and Technical Specifications 2.4.l.h and 2.4.3.e, Appendix B, for St. Lucie should include a dose assess.".ent with r espect to conformance with 40 CFR Part 190, or whatever a variance to 40 CFR Part 190 is projected.
Sincerely, cc:
See next page A. Schwencer, Chief Operating Reactor s Branch
."'.1 Division of Operating Reactors
~eve-t E. Unria
.=i or:ca Power dna Light Company December 19, 1979
.M.. Zonert Lowenstein, Esquire Lowenstein, Newman,'eis and Axelrad 102": Connecticut
- Avenue, N.M.
Sui ~> 121.
iasiington, D.
C.
20036 E~v ronnental and Urban Affairs Library Fl orica ante. national University
'liarri, r.1 orida 33199
."..-. Nor...an A. Coll, Esquire S=eel,:-;ector and Davis I"OC Southeast First National Bank:-ui I aing
'iiarri,; I orida 33131
<r. 'Henry Yaeger, Plant Hanager
- turkey Point Plant F1orica ?ower and Light Company P.
C.
Pox 013100 M.iani, Florida 33101
.'.. Jack Shreve
- ff-;ce of the Public Counsel
.Z~or, ~,
.".ol land 8uil ding
. al ahassee, Fl orioa 32304