Forwards IE Insp Rept 50-389/79-19 on 791022-25.No Noncompliance Noted
ML17207A696
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/09/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A697 List:
References
NUDOCS 7912310281
Download: ML17207A696 (2)


See also: IR 05000389/1979019

Text

~R RE0y

~O

~o

fy

~u

o

IA

Jc,

C

+~ '0

++*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

NOY - 9 1979

In Reply Refer To:

RII:TEB

50"389/79-19

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced

Systems

and Technology

P.

O.

Box 529100

Miami, FL

, 33152

Gentlemen:

This refers to the inspection

conducted

by T. E. Burdette of. this office on

October 22-25,

1979, of activities authorized

by NRC Construction Permit No.

CPPR-144 for the St. Lucie facility, and to the discussion of our findings held

with B. J.

Escue at the conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in the

enclosed

inspection report.

Within these

areas,

the inspection consisted

of

selective

examinations

of procedures

and representative

records

interviews with

7

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined actions

you have taken with regard to previously identified

enforcement matters.

These

are discussed

in the enclosed

inspection report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document.

If we do not hear from you in this regard within

the specified period,

the report will be placed in the Public Document

Room.

Florida Power and Light

Company

NOV -

O 1g7g

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chic

Reactor Construction

and Engineering

Support Branch

'Enclosure:

Inspection Report No. 50-389/79-19

cc w/encl:

C.

M. Wethy, Plant Manager

P. 0.

Box l28

Ft. Pierce,

FL

33450

Nat Weems, Assistant

gA Manager

~

~

~

P. 0.

Box 128

Ft. Pierce,

FL

33450