Forwards IE Insp Rept 50-335/79-23 on 790910-14 & Notice of Violation
ML17207A625
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/15/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17207A623 List:
References
NUDOCS 7912100455
Download: ML17207A625 (3)


See also: IR 05000335/1979023

Text

~9 REgy

io

+w*e+

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

In Reply Refer To:

RII:PAT

50-335/79-23

DCT 1 5 1979

Florida Power and Light Company

Attn:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

Post Office. Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by P. A. Taylor of this office on

September

10-14,

1979 of activities authorized by NRC License

No. DPR-67 for the

St. Lucie facility, and to the discussion of our findings held with C. Wethy at

the conclusion of the inspection.

Areas examined during the inspection

and our findings are discussed in the

enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

One new unresolved

item resulted

from this inspection

and is discussed

in the

enclosed report.

This item will be examined during subsequent

inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements

are listed in the Notice of Violation enclosed

here-

with as Appendix A.

This notice is, sent to you pursuant to the provisions of

Section 2.20l of the NRC's "Rules of Practice", Part 2, Title 10,

Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice,

a written statement

or explanation in reply

including:

(l) corrective steps

which have been taken by you, and the results

achieved;

(2) corrective steps

which will be taken to avoid further-noncompliance;

and (3) the date

when full compliance will be achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title l0, Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document

Room. If .this

report contains

any information that you (or your contractor) believe to be

proprietary, it is necessary

that you make

a written application within 20 days

5 1979

Florida Power and Light Company

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

. T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-335/79-23

cc w/enclosures:

C.

M. Wethy, Plant Manager

Post Office Box 128

Ft. Pierce, Florida

33450

Nat Weems, Assistant.

QA Manager

Post Office Box 128

Ft. Pierce, Florida

33450