Text
~9 REgy
io
+w*e+
UNITEDSTATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
In Reply Refer To:
RII:PAT
50-335/79-23
DCT 1 5 1979
Florida Power and Light Company
Attn:
R. E. Uhrig, Vice President
Advanced Systems
and Technology
Post Office. Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the inspection
conducted
by P. A. Taylor of this office on
September
10-14,
1979 of activities authorized by NRC License
No. DPR-67 for the
St. Lucie facility, and to the discussion of our findings held with C. Wethy at
the conclusion of the inspection.
Areas examined during the inspection
and our findings are discussed in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
One new unresolved
item resulted
from this inspection
and is discussed
in the
enclosed report.
This item will be examined during subsequent
inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
This item and references
to pertinent requirements
are listed in the Notice of Violation enclosed
here-
with as Appendix A.
This notice is, sent to you pursuant to the provisions of
Section 2.20l of the NRC's "Rules of Practice", Part 2, Title 10,
Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice,
a written statement
or explanation in reply
including:
(l) corrective steps
which have been taken by you, and the results
achieved;
(2) corrective steps
which will be taken to avoid further-noncompliance;
and (3) the date
when full compliance will be achieved.
In accordance
with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title l0, Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If .this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20 days
5 1979
Florida Power and Light Company
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document
Room.
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
. T. Sutherland,
Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
l.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-335/79-23
cc w/enclosures:
C.
M. Wethy, Plant Manager
Post Office Box 128
Ft. Pierce, Florida
33450
Nat Weems, Assistant.
QA Manager
Post Office Box 128
Ft. Pierce, Florida
33450