ML17207A616
| ML17207A616 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/29/1979 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7912060492 | |
| Download: ML17207A616 (3) | |
Text
REGULATORY
'FORMATION DISTRIBUTION SY M (RIDS)
ACCESSION NBR ~ 79 1 2060 l92 DOC ~ DATE ~ 79/ 1 1/29 NOTARIZED ~
NO FACIAL!
50 Q5 Ho AQTH ~ NAME AUTHOR AFFILIATION't'kcit-@ ]
UHRIGgR ~ K, Florida Power L Light Co, RECIP ~ NAME RECIPIENT AFFILIATION REED;R.S, 'perating Reactors Branch DOCKET El 0500085
SUBJECT:
Ack receipt of NRC 790927 8
1023 ltrs re containment purging 8'enting during norma'I operation.Response will be submitted by 191218.
DISTRIBUTION CODE:
A034S COPIES RECEIVED:I TR g ENCL ~
SIZE:
TI E; Containment Purging N
CC ~
OTES ~
RECIPIENT COPIES ID CODE/NAME LTTR EN I.
ACTION:
05 BC LM8 4 4 7
RECIPIENT COPIES ID CODE/NAME L'fTR ENCL INTERNAL:
0 G FILE 12i5 CORK PERF 18 RKAC SF@
20 KEB 22 BAINKMAN 24 E
REEVES EXTERNALS 03 LPDR 25 ACRS 1
16 1
02 NRC PDR 14 TA/EDO 17 ENGR BR 19 PLANT SYS BR 21 EFLT TRT SYS 23 D
SHUM'4 NSIC 1
1 1
(
1i 1
TOTAI. NUMBER. OF COPIES REQUIRED ~
LTTR 39 ENCI.
~
lt
~
t
~
(
tl
P.o. BOX 629100, MIAMI,FL 33162
/tlvlA FLORIDA POWER 4 LIGHTCOMPANY November 29, 1979 L-79-332 Office of Nuclear Reactor Regulation Attention:
Mr,.
R.
W. Reid, Chief Operating Reactors Branch 84 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Reid:
Re:
St. Lucie Unit 1
Docket No. 50-335 Containment Pur e
References:
(1)
NRC letter dated September 27, ]979 from Darrell G. Eisenhut to All Light Water Reactors (2)
NRC letter dated October 23, 1979 from R.
W, Reid to R,
E, Uhrig (applicable to Docket No. 50-335)
The referenced letters request information and comIitments regarding contain-ment venting and purging during normal operation.
We are expediting resolution of.'this issue with our NSSS vendor, architect-engineer, and purge valve manufacturer.
Rather than fragment our efforts by providing a separate response to each of the referenced letters, we would prefer to respond with a single report in December.
Consequently, we have scheduled December 13, 1979 as the due date for submittal of a combined response to References (1) and (2).
Please call if you" have additional questions on this subject, Very truly yours, Robert E. Uhrig Vice President Advanced SystetIIs 8 Technology REU/MAS/paf cc:
Mr. J.
P. 0'Rei,lly, Region II Harold Reis, Esquire voxsooo '/~4 Wo3V
//o PEOPLE... SERVING PEOPLE