ML17207A563

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-17,Revision 1, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. No Response Required
ML17207A563
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/29/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 7911150173
Download: ML17207A563 (2)


Text

1P,S REoy

~4

~o 0

i~

o cAo Co

+~

~O

+a*++

In Reply Refer To:

RII:JPO 50-389 UNITED STATES UCLEAR REGULATORY COMMISSION REGION II 101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 OCT 2 9 1979

/o~P Florida Power and Light Company Attn:

R. E. Uhrig, Vice President Advanced Systems and Technology P. 0. Box 529100 Miami, Florida 33152 Gentlemen:

The enclosed Bulletin No. 79-17, Revision 1 is forwarded to you for information.

No written response is required.

However, the potential corrosion behavior of safety-related systems as it regards your plant over the long-term should be taken into consideration.

If you desire additional information concerning this matter, please contact this office.

Sincerely, 1

James P. O'Reilly Director

Enclosure:

IE Bulletin No. 79-17, Revision 1 w/encls.

7911150I ~>

Florida Power and Light Company cc w/encl:

C.

M. Wethy, Plant Manager Post Office Box 128 Ft. Pierce, Florida 33450 Nat Weems, Assistant QA Manager Post Office Box 128 Ft. Pierce, Florida 33450