ML17207A522

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-13,Revision 2, Cracking in Feedwater Sys Piping. Action Required
ML17207A522
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 10/17/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 7911070127
Download: ML17207A522 (2)


Text

~R IIEET(j

~4

~o Cy

)

g 0

VJ (i

V

~O

+a*++

In Reply Refer To:

RII:JPO 50-250 50-251 UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 Og f 7 1979 Florida Power and Light Company Attn:

R.

E. Uhrig, Uice President Advanced Systems and Technology P.

O. Box 529100 Miami, Florida 33152 Gentlemen:

Enclosed is IE Bulletin No. 79-13, Revision 2 which requires action by you with regard to your power reactor facility(ies).

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely, qadi mes P. O'Reilly D

ector

Enclosures:

l.

IE Bulletin No. 79-13, Revision 2 w/Attachments 2.

List of IE Bulletins Issued in Last Six Months 19ZZ040

OGT 17 1979 Florida Power and Light Company

-2" cc w/encl:

C.

M. Wethy, Plant Manager Post Office Box 128 Ft. Pierce, Florida 33450 Nat Weems, Assistant QA Manager Post Office Box 128 Ft. Pierce, Florida 33450 H. E. Yaeger, Plant Manager Post Office Box 013100 Miami, Florida 33101