Forwards IE Insp Rept 50-387/79-08 on 790227-0302.No Noncompliance Noted
ML17207A234
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 03/30/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17207A236 List:
References
NUDOCS 7906140201
Download: ML17207A234 (2)


See also: IR 05000387/1979008

Text

!'

,~E R60>,

Ip0

C

,II

Pp

0

++**+

Docket No. 50-387

UNITED STATES

NUCLEAR REGULATORY. COMMISSION

REGION I

631 PARK AVENUE

KING OF PRUSSIA, PENNSYLVANIA 16406

SD MaR $7~

Pennsylvania

Power

8I Light Company

ATTN:

Mr. Norman

W. Curtis

Vice President

Engineering

and Construction

(N-4)

2 North Ninth Street

Allentown, Pennsylvania

18101

Gentlemen:

Subject:

Inspection

50-387/79-08

This refers to the inspection

conducted

by Mr. W.

Raymond of this office

on February

27 - March 2, 1979, at Susquehanna

Steam-Electric Station,

Unit', Berwick, Pennsylvania,

of activities authorize'd

by NRC License

No.

CPPR-101

and to the discussions

of our findings held by Mr. Raymond

with Mr-. A; Sabol

and other members of your staff at the conclusion of

the inspection,

and to.subsequent

telephone

discussions

between

Mr.

Raymond

and Mr. Sabol

on March 9, 1979,

and between

Mr. McVicker and Mr.

Raymond

on March 20, 1979.,

AIeas examined during this inspection

are described

in the Office of

Inspection

and Enforcement Inspection

Report which is enclosed with this

letter.

Within these

areas,

the inspection consisted-of'selective

examinations of'rocedures

and representative

records,

interviews with

personne'i,

and observations

by the inspector.

Within the 'scope of this inspection,

no items of noncompliance

were

observed.

In accordance

with Section

2.790 of the NRC's "Rules of Practice,"

Part

2, Title 10,

Code of Federal

Regulations,

a copy of this letter and the

enclosed

inspection report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor)

believe to be proprietary, it is necessary

that you make

a written

application within 20 days"to this office to withhold such information

from public..disclosure.

Any such application must

be accompanied

by an

affidavit executed

by the owner of the"information, which identifies the

document or part sought to be withheld,

and which contains

a statement

of reasons

which addresses

with specificity the items which will be

considered

by the Commission

as listed in subparagraph

(b)(4) of Section

V906140~)

Pennsylvania

Power

5 Light

Company

3 0 SWR 1979

2.790.

The information sought to be withheld shall

be incorporated

as

far as possible into a separate

part of the affidavit. If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document

Room.

h

No reply to this letter is required;

however, if you should

have

any

questions

concerning this inspection,

we will be pleased

to discuss

them

with you.

Sincerely,

jg

ldon J. Brunner, Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

Office of Inspection

and Enforcement

Inspection

Report

Number 50-387/79-08

cc w/encl:

A.

R. Sabol,

Manager,

Nuclear guality Assurance

H.

E. Barberich,

Licensing Engineer

R.

W. Dunn, Superintendent

of Plant