Text
!'
,~E R60>,
Ip0
C
,II
Pp
0
++**+
Docket No. 50-387
UNITED STATES
NUCLEAR REGULATORY. COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 16406
SD MaR $7~
Power
8I Light Company
ATTN:
Mr. Norman
W. Curtis
Vice President
Engineering
and Construction
(N-4)
2 North Ninth Street
Allentown, Pennsylvania
18101
Gentlemen:
Subject:
Inspection
50-387/79-08
This refers to the inspection
conducted
by Mr. W.
Raymond of this office
on February
27 - March 2, 1979, at Susquehanna
Steam-Electric Station,
Unit', Berwick, Pennsylvania,
of activities authorize'd
by NRC License
No.
CPPR-101
and to the discussions
of our findings held by Mr. Raymond
with Mr-. A; Sabol
and other members of your staff at the conclusion of
the inspection,
and to.subsequent
telephone
discussions
between
Mr.
Raymond
and Mr. Sabol
on March 9, 1979,
and between
Mr. McVicker and Mr.
Raymond
on March 20, 1979.,
AIeas examined during this inspection
are described
in the Office of
Inspection
and Enforcement Inspection
Report which is enclosed with this
letter.
Within these
areas,
the inspection consisted-of'selective
examinations of'rocedures
and representative
records,
interviews with
personne'i,
and observations
by the inspector.
Within the 'scope of this inspection,
no items of noncompliance
were
observed.
In accordance
with Section
2.790 of the NRC's "Rules of Practice,"
Part
2, Title 10,
Code of Federal
Regulations,
a copy of this letter and the
enclosed
inspection report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your contractor)
believe to be proprietary, it is necessary
that you make
a written
application within 20 days"to this office to withhold such information
from public..disclosure.
Any such application must
be accompanied
by an
affidavit executed
by the owner of the"information, which identifies the
document or part sought to be withheld,
and which contains
a statement
of reasons
which addresses
with specificity the items which will be
considered
by the Commission
as listed in subparagraph
(b)(4) of Section
V906140~)
Power
5 Light
Company
3 0 SWR 1979
2.790.
The information sought to be withheld shall
be incorporated
as
far as possible into a separate
part of the affidavit. If we do not
hear from you in this regard within the specified period, the report
will be placed in the Public Document
Room.
h
No reply to this letter is required;
however, if you should
have
any
questions
concerning this inspection,
we will be pleased
to discuss
them
with you.
Sincerely,
jg
ldon J. Brunner, Chief
Reactor Operations
and Nuclear
Support Branch
Enclosure:
Office of Inspection
and Enforcement
Inspection
Report
Number 50-387/79-08
cc w/encl:
A.
R. Sabol,
Manager,
Nuclear guality Assurance
H.
E. Barberich,
Licensing Engineer
R.
W. Dunn, Superintendent
of Plant