Forwards IE Insp Rept 50-335/79-03 on 790115-19. No Noncompliance Noted
ML17206A748
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/12/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17206A747 List:
References
NUDOCS 7904260093
Download: ML17206A748 (2)


See also: IR 05000335/1979003

Text

I

I

~$ REPp

~4

0

f

UNITEDSTATES

NUCLEAR REGULATORYCOMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

In Reply Refer To:

RII:RWZ

50-335/79-3

MAR

s '979

Florida Power and Light Company

Advanced

Systems

and Technology

ATTN:

Dr. R. E. Uhrig, Vice President

P. 0. Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Dr. R.

W. Zavadoski of this

.office on January

15 19, 1979, of activities authorized

by NRC

Operating License

No. DPR-67 for the St. Lucie 1 facility, and to the

discussion of our findings held with Mr. C. M. Wethy at the conclusion

of the inspection.

Areas examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter

and the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement

of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should be prepared

so that proprietary information identified in the application is

contained in a separate

part of the document.

If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document

Room.

V904S60& 5

41AR 1 2 1979

Should you have any questions

concerning this letter,

we will be glad

to discuss

them with you.

Sincerely,

ack T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

Inspection Report No. 50-335/79-3

cc:

Mr. C. M. Wethy, Plant Manager

St. Lucie Plant

P. 0. Box 128

Ft. Pierce, Florida

33450

Mr. Nat Weems, Assistant

QA Manager

P. 0.

Box 128

Ft. Pierce, Florida

33450